SW10JM INSTALLATION – CEILING APPLICATION
CEILING APPLICATION – COMPLETE INSTALLATION
New/Existing Construction
1. Use template to determine a suitable installation location. Place the SW10JM cardboard template in the desired location making sure the template is level and aligned correctly. You may want to staple the template in place for added ease.
Template
2a.Measure the width between the joists/studs and cut two 2 X 4’s to match this width. The 2 X 4’s will be used to cross brace between joists.
X Minimum | 2 x 4 | |
X | ||
Width Needed | ||
|
Studs
2b.Locate 2 x 4’s at end of template as shown. Position each 2 x 4 and attach to trusses using applicable local building methods.
Template
X Minimum
Width Needed
3a.Mark 4 hole locations from template. This area will be used for the grille cutout.
3b.Cut thru ceiling between marks (drywall, sheetrock, etc.) using appropriate tools
Drywall Saw | Frame | ➌ | |
➊ | |||
| |||
➋ |
| ➍ | |
Hole |
|
| |
| Bottom View |
(CONTINUED ON NEXT PAGE)