SW10JM INSTALLATION – FLOOR APPLICATION
FLOOR APPLICATION – COMPLETE INSTALLATION |
| |
New/Existing Construction |
| Floor |
1. Use template to determine a suitable installation |
|
|
location. Place the SW10JM cardboard template |
|
|
in the desired location making sure the template | Template |
|
is level and aligned correctly. You may want to |
| |
|
| |
staple the template in place for added ease. |
|
|
2a.Measure the width between the joists/studs and | Template |
| ||
cut two 2 X 4s to match this width. The 2 X 4s |
|
|
| |
will be used to cross brace between joists. |
|
|
| |
2b.Position each 2 X 4 according to |
|
|
| |
template. Attach each 2 X 4 to the |
|
|
| |
floor joists using applicable local | X Minimum |
| ||
building methods. | X | |||
Width Needed | ||||
|
|
XMinimum Width Needed
2 x 4
➊ Frame
3a.Mark 4 hole locations from template. This area will be used for the grille cutout.
➋ ➍
| Hole |
3b.Cut thru |
|
between marks using appropriate tools. | Bottom View |
(CONTINUED ON NEXT PAGE)
10