LG Electronics 395CAV installation instructions Ð16Ð

Page 16

© 1996 BDP Co. · P.O. Box 70 · Indianapolis, IN 46206

Printed in U.S.A.

Ð16Ð

395c4010

Catalog No. BDP-3339-518

Image 16
Contents Electrostatic Discharge ESD Precautions Safety ConsiderationsÐ1Ð Ðminimum Clearances from Combustible MaterialsÐdimensions Electrostatic Discharge ESD Precautions ProcedureÐ2Ð Unit Size Vent Conn SHIP. WT LBLocation IntroductionII. AIR for Combustion and Ventilation Unconfined Space Confined SpaceÐ4Ð 395CAV Furnace Minimum SQ FT with Input Btuh 2 FT CeilingIII. Filter Arrangement Ð5ÐIV. Leveling Legs if Required Ðfilter Information GAS PipingÐ6Ð Ðmaximum Capacity of PipeWiring AccessoriesVIII. START-UP, ADJUSTMENT, and Safety Check VI. Electrical ConnectionsÐ8Ð Ðelectrical DataSequence of Operation ÐControl Board Ð9Ð→ ÐUnit Wiring Diagram PCBStart-up Procedures AdjustmentsGAS Specific Gravity of Natural GAS Heat Value ExampleBTU/CU FT Ðgas Rate CU FT/HR → ÐRedundant Automatic Gas Control ValveÐcanadian Orifice Size GAS SEA Level High AltitudeÐspeed Selector ChecklistColor Speed Factory Attached to Service Training Ð16Ð