LG Electronics 395CAV installation instructions Ðelectrical Data, Ð8Ð, Sequence of Operation

Page 8

FIELD 24-VOLT WIRING

FIELD 115-, 208/230-, 460-VOLT WIRING

FACTORY 24-VOLT WIRING

FACTORY 115-VOLT WIRING

 

 

 

 

NOTE 2

 

 

 

THERMOSTAT

 

 

 

FIVE

 

W

C R

G

Y

FIELD-SUPPLIED

 

 

 

TERMINALS

 

 

 

 

 

 

 

 

 

WIRE

 

 

 

 

 

 

FUSED DISCONNECT

 

 

THREE-WIRE

 

 

 

 

 

 

208/230- OR

 

 

HEATING-

 

 

 

 

 

 

 

 

ONLY

 

 

 

 

 

 

460-VOLT

 

 

 

 

 

 

 

 

 

THREE

BLK

BLK

 

 

W

 

 

 

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WHT

WHT

 

 

R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

208/230-

 

GND

GND

 

 

 

 

 

 

VOLT

115-VOLT FIELD- AUXILIARY

 

G

 

 

 

 

SINGLE

 

 

 

 

 

 

PHASE

 

SUPPLIED

J-BOX

 

C

NOTE 1

 

 

 

GND

 

FUSED

CONTROL

Y

 

 

CONDENSING

DISCONNECT

BOX

 

 

 

UNIT

 

 

 

 

 

 

 

 

 

24-VOLT

 

 

 

TWO

 

 

 

TERMINAL

 

 

 

WIRE

 

 

 

 

BLOCK

NOTES: 1.

Connect Y-terminal as shown for proper operation.

 

 

FURNACE

 

 

 

2.￿ Some thermostats require a "C" terminal connection as shown.

 

 

 

 

 

 

3.If any of the original wire, as supplied, must be replaced, use same type or equivalent wire.

 

 

 

 

 

 

 

A95241

 

 

Fig. 8ÐHeating and Cooling Application Wiring Diagram

 

 

 

 

TABLE 5ÐELECTRICAL DATA

 

 

 

 

 

 

 

 

 

 

 

VOLTSÐ

OPERATING

 

 

 

MAXIMUM

 

VOLTAGE RANGE

MAXIMUM

MINIMUM

MAXIMUM

FUSE OR

UNIT SIZE

HERTZÐ

 

 

UNIT AMPS

WIRE GAGE

WIRE LENGTH (FT)³

HACR-TYPE CKT

 

PHASE

Maximum*

Minimum*

 

 

 

 

BKR AMPS²

 

 

 

 

 

024045

115Ð60Ð1

127

104

6.0

14

47

15

036045

115Ð60Ð1

127

104

8.3

14

34

15

024070

115Ð60Ð1

127

104

5.9

14

47

15

036070

115Ð60Ð1

127

104

8.7

14

32

15

042091

115Ð60Ð1

127

104

9.0

14

31

15

048091

115Ð60Ð1

127

104

10.4

14

27

15

036110

115Ð60Ð1

127

104

8.0

14

35

15

048111

115Ð60Ð1

127

104

10.1

14

28

15

060111

115Ð60Ð1

127

104

14.4

12

31

20

048135

115Ð60Ð1

127

104

10.1

14

28

15

060135

115Ð60Ð1

127

104

13.3

12

33

20

060155

115Ð60Ð1

127

104

14.0

12

31

20

 

 

 

 

 

 

 

 

*Permissible limits of the voltage range at which the unit operates satisfactorily. ² Time-delay fuse is recommended.

³ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.

The furnace must have a 115-v power supply properly connected and grounded. Proper polarity must be maintained for correct operation. Thermostat wire connections at R, W, C, and Y must be made at the 24-v terminal block on the control board. The gas service pressure must not exceed 0.5 psig (14-in. wc), but must be no less than 0.16 psig (4.5-in. wc).

CAUTION: This furnace is equipped with a manual reset limit switch or fuse link in the gas control area. The switch or fuse link opens and shuts off power to the gas valve if a flame rollout or overheating condition occurs in the gas control area. DO NOT bypass the switch. Correct inadequate combustion air supply problem and reset the switch or replace the fuse link.

Before operating the furnace, check each manual reset switch for continuity. If necessary, press the button to reset the switch.

Ð8Ð

The blower compartment door must be in place to complete the 115-v circuit to the furnace.

B. Sequence of Operation

CAUTION: Furnace control must be grounded for proper operation, or control will lockout. Control is grounded through green wire routed to gas valve and burner bracket screw.

Using the schematic diagram shown in Fig. 11, follow the sequence of operation through the different modes. Read and follow the wiring diagram very carefully.

NOTE: If there is a power interruption and any thermostat call, the control initiates a 90-sec blower only on period before starting another cycle.

Image 8
Contents Electrostatic Discharge ESD Precautions Safety ConsiderationsÐ1Ð Ðminimum Clearances from Combustible MaterialsÐdimensions Electrostatic Discharge ESD Precautions ProcedureÐ2Ð Unit Size Vent Conn SHIP. WT LBII. AIR for Combustion and Ventilation IntroductionLocation Unconfined Space Confined SpaceÐ4Ð 395CAV Furnace Minimum SQ FT with Input Btuh 2 FT CeilingIV. Leveling Legs if Required Ð5ÐIII. Filter Arrangement Ðfilter Information GAS PipingÐ6Ð Ðmaximum Capacity of PipeWiring AccessoriesVIII. START-UP, ADJUSTMENT, and Safety Check VI. Electrical ConnectionsSequence of Operation Ðelectrical DataÐ8Ð ÐControl Board Ð9Ð→ ÐUnit Wiring Diagram PCBStart-up Procedures AdjustmentsBTU/CU FT ExampleGAS Specific Gravity of Natural GAS Heat Value Ðgas Rate CU FT/HR → ÐRedundant Automatic Gas Control ValveÐcanadian Orifice Size GAS SEA Level High AltitudeColor Speed Factory Attached to ChecklistÐspeed Selector Service Training Ð16Ð