LG Electronics LP121CEM-Y8 manual Spraying

Page 27

Figure 38

Spraying

Tube

Pump

assembly

Tube #1

Rubber

elbows(3)

Tube #2

15. Assembly the unit back following the reverse order of disassembly.

NOTE: All tube should be inserted into rubber elbows by at least 1/2 inch

Figure 39

14. Connect the condensate pump to the ICR

Figure 40

relay of the terminal of the board as shown

 

in fig. 40 Make sure to fasten the pump

 

wire through the wire clip on the back side

 

of the control barrier as shown in fig. 39

 

Copyright ©2008 LG Electronics. Inc. All right reserved.

- 27 -

Only for training and service purposes

LGE Internal Use Only

 

Image 27
Contents SVC Manual Model LP121CEM-Y8 SpecificationSleeve and the Rear Grille Features and BenefitsQuick Heater Recovery Door Switch/Occupancy SensorOutdoor Air Temperature Switchover Temperature limitsCooling only Model Control LocationsOperation Electric Heating Model VentilationAdditional Controls Temperature LimitingAdditional Controls Removing the Front GrilleRemote Wall Thermostat REMOTE/LOCAL ControlEnergy Saver Front Desk ControlDisassembly Instructions Mechanical PartsFront Grille Control BOX Electric Heater Electric Heater Model only AIR Handling PartsAxial FAN Cross Flow FANCompressor Electrical PartsShroud Outdoor Motor6 P.C.B Power CordCapillary Tube Refrigeration CycleCondenser EvaporatorLGE Internal Use Only Pulling Vacuum Dimension of sleeve assembly optional InstallationHOW to Install the Unit Dimension of air conditionerWall Sleeve Installation Wall Case Installation DataGeneral Installation of Wall Case in Wall Opening Preparation of the Front GrillePreparation of the Wall Case for All Types of Construction LGE Internal Use Only Sub-Base Connected Unit Installation 208, 230, and 208/230 Volt Units Electrical SafetyElectrical Requirements Electrical Data for 230/208V ModelDescription Field Installed AccessoriesInstallation Control Panel Key LockHazardous Voltage Condensate Disposal Pump Kit InstallationPlace the top cover assembly back into the unit Spraying Architectural Grille Architecture Grille Aluminum Single PackCondensate Drain kit Drain InstallationOutdoor Drain Kit Installation Outdoor Drain Kit InstallationIndoor Drain Kit Installation ChecklistLeveling Legs Leveling Leg Assembly Installation on Wall Sleeve Leveling Leg AssemblyHard Wire Kit Junction Box Kit Installation and Wiring ProcedureUse Copper Conductors Only Volt Units 208/230 Volt UnitsStandard Escutcheon Remote Escutcheon KitSubbase Part/Location Identification Troubleshooting Guide Outside DimensionsPiping System Troubleshooting Guide Fails to Start Complaint Cause Remedy 208/230V 187V 253V Room AIR Conditioner Voltage LimitsComplaint Cause Remedy CN-IDPT Piping DiagramsPart A, there are 3 types Schematic Diagram435300B Exploded ViewEnlarged picture Condenser Outdoor Service Replacement ProcedureFebruary