
Installation


 Piping
Piping Length
Length
 and
and Elevation
Elevation




























| Capacity | Pipe Size | Standard Length | Max. | Max. | Additional Refrigerant | |
| (Btu/h) | 
 | 
 | m(ft) | Elevation B | Length A | g/m(oz/ft) | 
| GAS | LIQUID | m(ft) | m(ft) | |||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 9k, 12k | 9.52 (3/8") | 6.35(1/4") | 7.5 (25) | 7 (23) | 15 (49) | 20 (0.22) | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 18k | 12.7(1/2") | 6.35(1/4") | 7.5 (25) | 7 (23) | 15 (49) | 20 (0.22) | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 24k | 15..88(5/8") | 9.52(3/8") | 7.5 (25) | 15 (49) | 30 (98) | 30 (0.33) | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
ENGLISH
Indoor unit
B
A
Outdoor unit
A
Indoor unit
Outdoor unit
Outdoor unit
| Oil trap | A | 
| 
 | 
BIndoor unit
B
If piping length is more than 5 m (16.4 ft)
Capacity is based on standard length and maximum allowance length is on the basis of reliability. Oil trap should be installed every 5~7 meters(16.4~23.0ft).
Installation Manual 11