LG Electronics MFL39817303 installation manual For left rear piping

Page 16

Installation

For left rear piping

1.Route the indoor tubing and the drain hose to the required piping hole position.

2.Insert the piping, drain hose, and the connecting cable into the piping hole.

3.Insert the connecting cable into the indoor unit.

Don't connect the cable to the indoor unit.

Make a small loop with the cable for easy connection later.

Connecting

cable

Drain pipe

4.Tape the drain hose and the connecting cables.

5.Indoor unit installation

Hang the indoor unit from the hooks at the top of the installation plate.

Insert the spacer etc. between the indoor unit and the installation plate and separate the bottom of the indoor unit from the wall.

Connecting the piping to the indoor unit and the drain hose to drain pipe.

1.Align the center of the pipes and sufficiently tighten the flare nut by hand.

2.Tighten the flare nut with a wrench.

Outside diameter

Torque

 

 

 

 

mm

inch

kgf.m

lbf.ft

Ø6.35

1/4

1.8~2.5

13~18

Ø9.52

3/8

3.4~4.2

24.6~30.4

Ø12.7

1/2

5.5~6.6

39.8~47.7

Ø15.88

5/8

6.3~8.2

45.6~59.3

 

 

 

 

3.When extending the drain hose at the indoor unit, install the drain pipe.

Indoor unit

Spacer

Installation plate

8cm

3.15 in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Indoor unit tubing

Flare nut Pipes

 

 

 

 

 

 

 

 

 

 

Open-end wrench (fixed)

Flare nut

Wrench

Connection pipe

Indoor unit tubing

Drain hose

Indoor unit drain hose

Adhesive Vinyl tape (narrow)

16Room Air Conditioner

Image 16
Contents Room Air Conditioner Table of Contents Installation Instructions Be sure not to do Be sure to follow the instruction No installation may cause a fire and electrical shockIt may cause injury or an accident Operation Otherwise, it may cause water leakage Otherwise, it may cause dispute with the neighborsOtherwise, it may cause vibration or water leakage Otherwise, it may do harm to your healthSymbols used in this Manual FeaturesInstallation Tools Installation PartsRead carefully, and then follow step by step Installation Map Indoor unit Select the best LocationOutdoor unit Piping Length and Elevation Drill a Hole in the Wall Fixing Installation PlateType Flaring Work Cutting TubesBurrs removal Putting nut onConnecting the Piping CheckIndoor Foamed polyethylene or equivalent is recommendedIndoor unit installation Lbf .ftFor left rear piping Piping for passage through piping hole Good case Bad caseConnecting the Cables How to use the front panelOutdoor Move the link upward and close the front panelFront panel removing Refix the cover control to the original position Connect the wires to the terminals onWith the screw For strand wiring How to connect wiring to the terminalsConnecting cable Checking the Drainage To check the drainageDrain piping Pour a glass of water on the evaporatorForming the Piping Air purging Air PurgingAir purging with vacuum pump Soap water method EvacuationFinishing the job If bubbles come out, the pipes have leakagePrepare remote controller Test RunningSettlement of outdoor unit Evaluation of the performancePump Down Procedure Pump DownInstallation guide at the seaside Selecting the locationOutdoor UnitMemo Room Air Conditioner No. MFL39817303