LG Electronics MFL39817303 installation manual Installation Map

Page 9

Installation

InstallationMap

NOTICE

Installation parts you should purchase.

 

Installation plate

 

Sleeve

 

Bushing-Sleeve

 

Putty(Gum Type Sealer)

 

Bend the pipe as closely

 

on the wall as possible,

 

but be careful that it

 

doesn't break.

Air Discarge

 

Vertical Air deflector

 

Operation Indication Lamps/

Vinyl tape (Wide)

Signal Receptor

• Apply after carrying out a

 

Forced Operation Button

drainage test.

 

• To carry out the drainage

Saddle

test, remove the air filters

and pour water into the heat

 

exchanger.

ENGLISH

Air Inlet Vents

Air Outlet Vents

Base Plate

Gas side piping (Optional Parts)

Liquid side piping (Optional Parts)

Additional drain pipe

Vinyl tape (Narrow) Drain Hose Connecting cable (Optional Parts)

Installation Manual 9

Image 9
Contents Room Air Conditioner Table of Contents Installation Instructions No installation may cause a fire and electrical shock Be sure not to do Be sure to follow the instructionIt may cause injury or an accident Operation Otherwise, it may cause dispute with the neighbors Otherwise, it may cause water leakageOtherwise, it may cause vibration or water leakage Otherwise, it may do harm to your healthFeatures Symbols used in this ManualInstallation Parts Installation ToolsRead carefully, and then follow step by step Installation Map Select the best Location Indoor unitOutdoor unit Piping Length and Elevation Fixing Installation Plate Drill a Hole in the WallType Cutting Tubes Flaring WorkBurrs removal Putting nut onCheck Connecting the PipingIndoor Foamed polyethylene or equivalent is recommendedLbf .ft Indoor unit installationFor left rear piping Piping for passage through piping hole Bad case Good caseHow to use the front panel Connecting the CablesOutdoor Move the link upward and close the front panelFront panel removing Connect the wires to the terminals on Refix the cover control to the original positionWith the screw How to connect wiring to the terminals For strand wiringConnecting cable To check the drainage Checking the DrainageDrain piping Pour a glass of water on the evaporatorForming the Piping Air Purging Air purgingAir purging with vacuum pump Evacuation Soap water methodFinishing the job If bubbles come out, the pipes have leakageTest Running Prepare remote controllerSettlement of outdoor unit Evaluation of the performancePump Down Pump Down ProcedureSelecting the locationOutdoor Unit Installation guide at the seasideMemo Room Air Conditioner No. MFL39817303