Check

1.Compare the flared work with the figure by.

2.If a flared section is defective, cut it off and do flaring work again.

Smooth all round

 

 

Inside is shiny without scratches

 

= Improper flaring =

Inclined

Surface

Cracked Uneven

Even length

damaged

thickness

 

 

all round

 

 

ConnectingthePiping

Indoor

1. Prepare the indoor unit's piping and drain hose for installation through the wall.

2. Remove the plastic tubing retainer(see the illustration by) and pull the tubing and drain hose away from chassis.

3. Replace only the plastic tubing holder 1, not the holder 2 in the original position.

For right rear piping

1.Route the indoor tubing and the drain hose in the direction of rear right.

2.Insert the connecting cable into the indoor unit from the outdoor unit through the piping hole.

Do not connect the cable to the indoor unit.

Make a small loop with the cable for easy connection later.

3.Tape the tubing, drain hose, and the connecting cable. Be sure that the drain hose is located at the lowest side of the bundle. Locating at the upper side can cause drain pan to overflow inside the unit.

If the drain hose is routed inside the room, insulate the hose with an insulation material* so that dripping from "sweating"(condensation) will not damage furniture or floors.

*Foamed polyethylene or equivalent is recommended.

Drain hose

Tape

Connecting

pipe

Drain hose

Connecting cable

14Room Air Conditioner

Image 14
Contents Room Air Conditioner Table of Contents Installation Instructions It may cause injury or an accident No installation may cause a fire and electrical shockBe sure not to do Be sure to follow the instruction Operation Otherwise, it may cause vibration or water leakage Otherwise, it may cause water leakageOtherwise, it may cause dispute with the neighbors Otherwise, it may do harm to your healthSymbols used in this Manual FeaturesRead carefully, and then follow step by step Installation PartsInstallation Tools Installation Map Outdoor unit Select the best LocationIndoor unit Piping Length and Elevation Type Fixing Installation PlateDrill a Hole in the Wall Burrs removal Flaring WorkCutting Tubes Putting nut onIndoor Connecting the PipingCheck Foamed polyethylene or equivalent is recommendedIndoor unit installation Lbf .ftFor left rear piping Piping for passage through piping hole Good case Bad caseOutdoor Connecting the CablesHow to use the front panel Move the link upward and close the front panelFront panel removing With the screw Connect the wires to the terminals onRefix the cover control to the original position Connecting cable How to connect wiring to the terminalsFor strand wiring Drain piping Checking the DrainageTo check the drainage Pour a glass of water on the evaporatorForming the Piping Air purging with vacuum pump Air PurgingAir purging Finishing the job Soap water methodEvacuation If bubbles come out, the pipes have leakageSettlement of outdoor unit Prepare remote controllerTest Running Evaluation of the performancePump Down Procedure Pump DownInstallation guide at the seaside Selecting the locationOutdoor UnitMemo Room Air Conditioner No. MFL39817303