ULTRAFORCE COMMERCIAL GAS WATER HEATER
SUF 120 thru 400 SERVICE HANDBOOK
CONTROLS – CENTRAL CONTROL BOARD – CCB
The Central Control Board or CCB is contained in the housing shown below. Access to the board and the wiring harness plugs can be accomplished by removing two Phillips screws holding the cover.
This view shows the cover removed from the CCB.
Remove these
screws to release
cover
The CCB is controlled by the settings given through the desk top menu (UIM). The CCB also
monitors all pressure switches, the hot surface
igniter, tank temperatures, the gas valve, the This is the back of the UIM. anodes, and the flame sensor.
The CCB directly controls blower speed on the SUF199 and 250 models and indirectly controls blower speed on the SUF 400 by means of a Variable Frequency Drive (see page 33).
Note: Improper operation may be the result of a loose connection. Please check all wiring connections and the power supply to the water heater.
State Water Heaters – Technical Training Department 22 | Ashland City, Tennessee © 2009 |
Servicing should only be performed by a Qualified Service Agent |