HOT SURFACE IGNITER

This water i s equipped with an electric hot surface i gniter. The i gniter m aterial i s silicone carbide and should not be handled with bare hands because of possible damage to the igniter.

The normal ohm reading at 77°F is listed between 40 and 70 ohms. The minimum igniter current monitored by the CCB is 2.7 amps. Once this threshold is met a check mark will appear by the igniter i con i n the UIM (display).

CONTROL TIMING

Pre-purge

25 seconds

 

 

Igniter Warm-up

17 seconds

 

 

Trial for ignition

5 seconds

Gas Control Open

 

 

 

Inter/Post Purge

30 seconds

 

 

FLAME SENSOR

This water hea ter is eq uipped w ith an electronic flame sensor. The flame sensor senses fl ame by passi ng a s mall electric current through the burner flame. This type of f lame s ensing is al so k nown a s fl ame rectification. T he CCB is l ooking fo r a minimum current of .7 micro amperes for the water heater to operate. Once this current is established the UIM will display a flame icon.

State Water Heaters – Technical Training Department 31

Ashland City, Tennessee © 2009

Servicing should only be performed by a Qualified Service Agent

198152-002

Image 32
Contents Service Handbook Table of Contents Ultraforce Commercial GAS Water HeaterIntroduction QualificationsTools Required Digital MultimeterGAS Pressure Specifications General InformationAdjustment Procedure GAS Pressure SUF120 and 150 Models High Altitude Installations SUF 120High Altitude Installation GAS OrificeHigh Altitude Adjustment SUF 300,400 SUF 300,400Installation Tips SUF 300 Venting Tables SUF 120 Vent Length Table Equivalent Feet Meters 120 throughVenting Tables SUF 300,400 Vent Length Table Equivalent Feet Meters 300,400Venting ALL Models Single Pipe Power Vent Using Room AIR Venting ALL Models TWO Pipe Direct Vent Using Outside AIR Vent Termination Direct Vent ALL Models Direct Venting ALL Models Control Overview ALL Models Status Description IconAdjusting Tank Temperature Operating SET Point Differential DisplayChanging the Display Units Fault and Warning Conditions Advanced Diagnostic Information Access to the Current Fault or Warning Viewing Information About the Water Heater Control Sequence Typical ALL Models Control Sequence Flow Chart Controls Central Control Board CCB Remove these Screws to release CoverControls GAS Valve SUF SUF 120 thru 400 Service Handbook Controls GAS Valve SUF 199 Important Note High Altitude InstallationSupply gas pressure Controls GAS Valve , Orifice CHART- SUF300,400 Orifice Chart SUF 300,400Controls Pressure Switches ALL Models Blocked Outlet Proving SwitchTop View of Pressure Switches Controls Pressure Switches SUF 300,400 Blocked Inlet Pressure Switch Odel PressureUltraforce Commercial GAS Water Heater Flame Sensor HOT Surface Igniter / Flame Sensor / Control TimingControl Timing Blower Speed Control SUF 199 ModelBlower Motor Wires Black White RED Ground HOT NeutralAI1 LI1 LI2 LI3 LI4Variable Frequency Drive Blower Speed and Pressure Readings Voltage Frequency Speed Instructions VFD ModelSUF 400Wiring Diagram SUF 120 Wiring Diagram SUF Tennessee Waltz Parkway Ashland City, TN