State Industries SUF100199, SUF100150 manual Direct Venting ALL Models

Page 14

ULTRAFORCE COMMERCIAL GAS WATER HEATER

SUF 120 thru 400 SERVICE HANDBOOK

DIRECT VENTING – ALL MODELS

The air intake provided on the unit contains a mesh screen to prevent large particles from entering the unit. WHEN THE UNIT IS TO BE SET UP AS A DIRECT VENT, THE BALANCE PLATE AND MESH

SCREEN MUST BE REMOVED BEFORE GLUING PIPE TO THE CONNECTOR. THE INLET VENT PIPE MAY THEN BE GLUED TO THE AIR INTAKE PROVIDED ON THE UNIT.

45° PVC Elbow

Remove the balance plate and mesh screen before gluing intake air pipe to the fitting.

3” 120-250

4” 300- 400

Two 3” or 4” 45° PVC elbows with mesh screens are provided with each unit. Both elbows are to be used in direct vent applications. The screens are provided to keep vermin and large debris from entering the intake air and exhaust vent runs.

State Water Heaters – Technical Training Department 13

Ashland City, Tennessee © 2009

Servicing should only be performed by a Qualified Service Agent

198152-002

Image 14
Contents Service Handbook Table of Contents Ultraforce Commercial GAS Water HeaterIntroduction QualificationsTools Required Digital MultimeterGAS Pressure Specifications General InformationAdjustment Procedure GAS Pressure SUF120 and 150 Models High Altitude Installations SUF 120High Altitude Installation GAS OrificeHigh Altitude Adjustment SUF 300,400 SUF 300,400Installation Tips SUF 300 Venting Tables SUF 300,400 Venting Tables SUF 120Vent Length Table Equivalent Feet Meters 120 through Vent Length Table Equivalent Feet Meters 300,400Venting ALL Models Single Pipe Power Vent Using Room AIR Venting ALL Models TWO Pipe Direct Vent Using Outside AIR Vent Termination Direct Vent ALL Models Direct Venting ALL Models Control Overview ALL Models Status Description IconAdjusting Tank Temperature Operating SET Point Differential DisplayChanging the Display Units Fault and Warning Conditions Advanced Diagnostic Information Access to the Current Fault or Warning Viewing Information About the Water Heater Control Sequence Typical ALL Models Control Sequence Flow Chart Controls Central Control Board CCB Remove these Screws to release CoverControls GAS Valve SUF SUF 120 thru 400 Service Handbook Controls GAS Valve SUF 199 Important Note High Altitude InstallationSupply gas pressure Controls GAS Valve , Orifice CHART- SUF300,400 Orifice Chart SUF 300,400Controls Pressure Switches ALL Models Blocked Outlet Proving SwitchTop View of Pressure Switches Controls Pressure Switches SUF 300,400 Blocked Inlet Pressure Switch Odel PressureUltraforce Commercial GAS Water Heater Flame Sensor HOT Surface Igniter / Flame Sensor / Control TimingControl Timing Blower Speed Control SUF 199 ModelAI1 Blower Motor Wires Black White REDGround HOT Neutral LI1 LI2 LI3 LI4SUF Variable Frequency Drive Blower Speed and Pressure ReadingsVoltage Frequency Speed Instructions VFD Model 400Wiring Diagram SUF 120 Wiring Diagram SUF Tennessee Waltz Parkway Ashland City, TN