State Industries SHE 50 76N instruction manual Power Vented GAS Models W/HOT Surface Ignition

Page 1

Instruction Manual

COMMERCIAL GAS WATER HEATERS

www.statewaterheaters.com

500 Tennessee Waltz Parkway

Ashland City, TN 37015

Technical Support 800-365-0024

Parts 800-821-2017

POWER VENTED GAS MODELS W/HOT SURFACE IGNITION

MODEL SHE 50 76N SERIES 100

Low Lead Content

For Your Safety

AN ODORANT IS ADDED TO THE GAS USED

BY THIS WATER HEATER.

ALL TECHNICAL AND WARRANTY QUESTIONS: SHOULD BE DIRECTED TO THE LOCAL DEALER FROM WHOM THE WATER HEATER WAS PURCHASED. IF YOU ARE UNSUCCESSFUL, PLEASE WRITE TO THE COMPANY LISTED ON THE RATING PLATE ON THE WATER HEATER.

 

Keep this manual in the pocket on heater for future reference

 

whenever maintenance adjustment or service is required.

PRINTED 0810

197421-003

Image 1
Contents Whenever maintenance adjustment or service is required Power Vented GAS Models W/HOT Surface IgnitionPrinted 197421-003Approvals Safe INSTALLATION, USE and ServiceImportant Definitions General Safety Information General Safety Information Introduction Table of ContentsApproved Carbon Monoxide Detectors Installation of Carbon Monoxide DetectorsSignage ExemptionsReplacement Parts and Deliming Products Typical InstallationElbow Access Door Condensate Hose and Drain PAN Mixing Valves Rough-In-Dimensions ROUGH-IN-DIMENSIONSCapacity and Gas and Electrical Characteristics Recovery capacity based on 90% thermal efficiencyFacts to Consider About the Location Locating the NEW Water HeaterAir REQUIREMENTs Insulation BlanketsConfined Space Unconfined SpaceFresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsOutdoor AIR Through TWO Vertical Ducts Outdoor AIR Through TWO Horizontal DuctsAIR from Other Indoor Spaces Chemical Vapor Corrosion Installing the NEW Water HeaterWater Piping Space Heating and Potable Water SystemThermal Expansion Temperature-Pressure Relief ValveValve and Pipe Insulation if supplied Contact qualified installer or service agency High Altitude InstallationGas Piping Filling the Water Heater Sediment TrapsPer square inch 3.5 kPa Venting Vent Pipe AssemblyVent Pipe Termination Termination Clearances Sidewall Power VentCondensate Planning the Vent SystemBreathing Hazard Carbon Monoxide Gas Installation of Vent System Blower Assembly InstallationVent Terminal INSTALLATION, Sidewall Chisel an opening approximately one half inch 1.3 cm larger Power Vent Wiring Schematic FigureThan the marked circle Pointed in the correct position, see FigureInstallation of Vertical Vent System Installation of Vent SYSTEM, SidewallVent attenuation assembly Flexible tubing Instruction sheet Vent Attenuation Assembly InstallationVertical VAA Installations Recommended Inch vent Vertical VAA Installations Recommended BRUSH* Size for Primer Cement Applications Vent Pipe PreparationStep E Step BStep F Step GDo not try to light the burner by hand Power Before ServicingWhat to do if YOU Smell GAS Do not TRY to Light the Burner by HandTemperature Indicators Temperature Adjustment Buttons Temperature RegulationDisplay D E FStart UP Conditions For Your InformationOperational Conditions Anode ROD Inspection Periodic MaintenanceKeep hands clear of drain Temperature-Pressure Relief Valve TestTo Flush the Water Heater Storage Tank Open the water heater drain valve to flush the storage tankLeakage Checkpoints ServiceTrouble Shooting Troubleshooting GuidelinesTurn off power to the water heater Ensure the flame sensor is clean use ultra fine steelAssembly if damaged or defective Unplug ignitor assembly plug from control. Check resistanceResistance of the black resistor wire between pins Unplug the ignitor assembly plug from the control. CheckAssembly .2 If the reading taken is less than 100,000 Check vent temperature limit switch if it is determinedTroubleshooting Guidelines Limited Warranty