State Industries SHE 50 76N instruction manual General Safety Information

Page 3

GENERAL SAFETY INFORMATION

3

Image 3
Contents 197421-003 Power Vented GAS Models W/HOT Surface IgnitionWhenever maintenance adjustment or service is required PrintedSafe INSTALLATION, USE and Service ApprovalsImportant Definitions General Safety Information General Safety Information Introduction Table of ContentsExemptions Installation of Carbon Monoxide DetectorsApproved Carbon Monoxide Detectors SignageTypical Installation Replacement Parts and Deliming ProductsElbow Access Door Condensate Hose and Drain PAN Mixing Valves Recovery capacity based on 90% thermal efficiency ROUGH-IN-DIMENSIONSRough-In-Dimensions Capacity and Gas and Electrical CharacteristicsFacts to Consider About the Location Locating the NEW Water HeaterAir REQUIREMENTs Insulation BlanketsOutdoor Air Through Two Openings Unconfined SpaceConfined Space Fresh Air Openings For Confined SpacesOutdoor AIR Through TWO Horizontal Ducts Outdoor AIR Through TWO Vertical DuctsAIR from Other Indoor Spaces Space Heating and Potable Water System Installing the NEW Water HeaterChemical Vapor Corrosion Water PipingTemperature-Pressure Relief Valve Thermal ExpansionValve and Pipe Insulation if supplied High Altitude Installation Contact qualified installer or service agencyGas Piping Sediment Traps Filling the Water HeaterPer square inch 3.5 kPa Venting Vent Pipe AssemblyVent Pipe Termination Termination Clearances Sidewall Power VentPlanning the Vent System CondensateBreathing Hazard Carbon Monoxide Gas Blower Assembly Installation Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Pointed in the correct position, see Figure Power Vent Wiring Schematic FigureChisel an opening approximately one half inch 1.3 cm larger Than the marked circleInstallation of Vertical Vent System Installation of Vent SYSTEM, SidewallVent Attenuation Assembly Installation Vent attenuation assembly Flexible tubing Instruction sheetVertical VAA Installations Recommended Inch vent Vertical VAA Installations Recommended BRUSH* Size for Primer Cement Applications Vent Pipe PreparationStep G Step BStep E Step FDo not TRY to Light the Burner by Hand Power Before ServicingDo not try to light the burner by hand What to do if YOU Smell GASD E F Temperature RegulationTemperature Indicators Temperature Adjustment Buttons DisplayFor Your Information Start UP ConditionsOperational Conditions Anode ROD Inspection Periodic MaintenanceOpen the water heater drain valve to flush the storage tank Temperature-Pressure Relief Valve TestKeep hands clear of drain To Flush the Water Heater Storage TankLeakage Checkpoints ServiceTrouble Shooting Troubleshooting GuidelinesUnplug ignitor assembly plug from control. Check resistance Ensure the flame sensor is clean use ultra fine steelTurn off power to the water heater Assembly if damaged or defectiveCheck vent temperature limit switch if it is determined Unplug the ignitor assembly plug from the control. CheckResistance of the black resistor wire between pins Assembly .2 If the reading taken is less than 100,000Troubleshooting Guidelines Limited Warranty