State Industries SHE 50 76N Rough-In-Dimensions, Capacity and Gas and Electrical Characteristics

Page 10

ROUGH-IN-DIMENSIONS

Rough-In-Dimensions

Top/Side Inlet and Outlet: 3/4” NPT

Gas Inlet: 1/2” NPT

Capacity and Gas and Electrical Characteristics

All models - Maximum Supply Pressure: 14 inches W.C. (3.48kPa)

Minimum Supply Pressure Natural Gas: 5.0 inches W.C. (1.24kPa)

Minimum Pressure must be maintained under both load and no load (static and dynamic) conditions.

Recovery Capacities - U.S. Gallons/Hr. and Liters/Hr. at Temperature Rise Indicated

Recovery capacity based on 90% thermal efficiency.

10

Image 10
Contents Printed Power Vented GAS Models W/HOT Surface IgnitionWhenever maintenance adjustment or service is required 197421-003Approvals Safe INSTALLATION, USE and ServiceImportant Definitions General Safety Information General Safety Information Table of Contents IntroductionSignage Installation of Carbon Monoxide DetectorsApproved Carbon Monoxide Detectors ExemptionsReplacement Parts and Deliming Products Typical InstallationElbow Access Door Condensate Hose and Drain PAN Mixing Valves Capacity and Gas and Electrical Characteristics ROUGH-IN-DIMENSIONSRough-In-Dimensions Recovery capacity based on 90% thermal efficiencyLocating the NEW Water Heater Facts to Consider About the LocationInsulation Blankets Air REQUIREMENTsFresh Air Openings For Confined Spaces Unconfined SpaceConfined Space Outdoor Air Through Two OpeningsOutdoor AIR Through TWO Vertical Ducts Outdoor AIR Through TWO Horizontal DuctsAIR from Other Indoor Spaces Water Piping Installing the NEW Water HeaterChemical Vapor Corrosion Space Heating and Potable Water SystemThermal Expansion Temperature-Pressure Relief ValveValve and Pipe Insulation if supplied Contact qualified installer or service agency High Altitude InstallationGas Piping Filling the Water Heater Sediment TrapsPer square inch 3.5 kPa Vent Pipe Assembly VentingTermination Clearances Sidewall Power Vent Vent Pipe TerminationCondensate Planning the Vent SystemBreathing Hazard Carbon Monoxide Gas Installation of Vent System Blower Assembly InstallationVent Terminal INSTALLATION, Sidewall Than the marked circle Power Vent Wiring Schematic FigureChisel an opening approximately one half inch 1.3 cm larger Pointed in the correct position, see FigureInstallation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemVent attenuation assembly Flexible tubing Instruction sheet Vent Attenuation Assembly InstallationVertical VAA Installations Recommended Inch vent Vertical VAA Installations Vent Pipe Preparation Recommended BRUSH* Size for Primer Cement ApplicationsStep F Step BStep E Step GWhat to do if YOU Smell GAS Power Before ServicingDo not try to light the burner by hand Do not TRY to Light the Burner by HandDisplay Temperature RegulationTemperature Indicators Temperature Adjustment Buttons D E FStart UP Conditions For Your InformationOperational Conditions Periodic Maintenance Anode ROD InspectionTo Flush the Water Heater Storage Tank Temperature-Pressure Relief Valve TestKeep hands clear of drain Open the water heater drain valve to flush the storage tankService Leakage CheckpointsTroubleshooting Guidelines Trouble ShootingAssembly if damaged or defective Ensure the flame sensor is clean use ultra fine steelTurn off power to the water heater Unplug ignitor assembly plug from control. Check resistanceAssembly .2 If the reading taken is less than 100,000 Unplug the ignitor assembly plug from the control. CheckResistance of the black resistor wire between pins Check vent temperature limit switch if it is determinedTroubleshooting Guidelines Limited Warranty