State Industries SHE 50 76N Installation of Carbon Monoxide Detectors, Signage, Exemptions

Page 6

INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS

Commonwealth of Massachusetts

For all side wall terminated, horizontally vented power vent, direct vent, and power direct vent gas fueled water heaters installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

INSTALLATION OF CARBON MONOXIDE DETECTORS

At the time of installation of the side wall horizontal vented

gas fueled equipment, the installing plumber or gasfitter shall

observe that a hard wired carbon monoxide detector with an

alarm and battery back-up is installed on the floor level where

the gas equipment is to be installed. In addition, the installing

plumber or gasfitter shall observe that a battery operated or

hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the sidewall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the

services of qualified licensed professionals for the installation of

hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may

be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements provided that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

APPROVED CARBON MONOXIDE DETECTORS

Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/ UL 2034 listed and CSA certified.

SIGNAGE

A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one- half (1/2) inch in size, “gas vent directly below. Keep clear of all obstructions.”

Inspection

The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4.

EXEMPTIONS

The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:

1.The equipment listed in Chapter 10 entitled “Equipment Not

Required To Be Vented” in the most current edition of NFPA

54 as adopted by the Board; and

2.Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building, or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED

When the manufacturer of ProductApproved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1.Detailed instructions for the installation of the venting system design or the venting system components; and

2.A complete parts list for the venting system design or venting system.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED

When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems,” the following requirements shall be satisfied by the manufacturer:

1.The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

2.The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

6

Image 6 Contents
Printed Power Vented GAS Models W/HOT Surface IgnitionWhenever maintenance adjustment or service is required 197421-003 Safe INSTALLATION, USE and Service Approvals Important Definitions General Safety Information General Safety Information Table of Contents IntroductionSignage Installation of Carbon Monoxide DetectorsApproved Carbon Monoxide Detectors ExemptionsTypical Installation Replacement Parts and Deliming ProductsElbow Access Door Condensate Hose and Drain PAN Mixing Valves Capacity and Gas and Electrical Characteristics ROUGH-IN-DIMENSIONSRough-In-Dimensions Recovery capacity based on 90% thermal efficiencyLocating the NEW Water Heater Facts to Consider About the LocationInsulation Blankets Air REQUIREMENTsFresh Air Openings For Confined Spaces Unconfined SpaceConfined Space Outdoor Air Through Two OpeningsOutdoor AIR Through TWO Horizontal Ducts Outdoor AIR Through TWO Vertical DuctsAIR from Other Indoor Spaces Water Piping Installing the NEW Water HeaterChemical Vapor Corrosion Space Heating and Potable Water SystemTemperature-Pressure Relief Valve Thermal ExpansionValve and Pipe Insulation if supplied High Altitude Installation Contact qualified installer or service agencyGas Piping Sediment Traps Filling the Water HeaterPer square inch 3.5 kPa Vent Pipe Assembly VentingTermination Clearances Sidewall Power Vent Vent Pipe TerminationPlanning the Vent System CondensateBreathing Hazard Carbon Monoxide Gas Blower Assembly Installation Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Than the marked circle Power Vent Wiring Schematic FigureChisel an opening approximately one half inch 1.3 cm larger Pointed in the correct position, see FigureInstallation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemVent Attenuation Assembly Installation Vent attenuation assembly Flexible tubing Instruction sheetVertical VAA Installations Recommended Inch vent Vertical VAA Installations Vent Pipe Preparation Recommended BRUSH* Size for Primer Cement ApplicationsStep F Step BStep E Step GWhat to do if YOU Smell GAS Power Before ServicingDo not try to light the burner by hand Do not TRY to Light the Burner by HandDisplay Temperature RegulationTemperature Indicators Temperature Adjustment Buttons D E FFor Your Information Start UP ConditionsOperational Conditions Periodic Maintenance Anode ROD InspectionTo Flush the Water Heater Storage Tank Temperature-Pressure Relief Valve TestKeep hands clear of drain Open the water heater drain valve to flush the storage tankService Leakage CheckpointsTroubleshooting Guidelines Trouble ShootingAssembly if damaged or defective Ensure the flame sensor is clean use ultra fine steelTurn off power to the water heater Unplug ignitor assembly plug from control. Check resistanceAssembly .2 If the reading taken is less than 100,000 Unplug the ignitor assembly plug from the control. CheckResistance of the black resistor wire between pins Check vent temperature limit switch if it is determinedTroubleshooting Guidelines Limited Warranty