Avalon Stoves 700 B-VENT manual Installation Preparation, Items Required for Installation

Page 6

PAGE 6 STOVE INSTALLATION - For qualified installers only!

Installation Preparation

!This appliance must be installed in accordance with all local codes, if any; if not, follow ANSI Z223.1 and the requirements listed in this manual. Failure to follow all of the requirements may result in property damage, bodily injury, or even death.

!Notify your insurance company before hooking up this heater.

!The requirements listed below are divided into sections. All requirements must be met simultaneously. The order of installation is not rigid Ð the qualified installer should follow the procedure best suited for the installation.

Items Required for Installation

¥B-Vent System

¥Brass, Black, or Cast Legs or Pedestal

¥Gas Hookup Equipment

Items Packed with the Chelan (700) B-Vent

¥Gas Inlet (3/8" Pipe)

¥Propane Conversion Kit

¥Owner's Manual

¥Log Set (2 Logs, 2 Twigs, Embers)

¥2 Leveling Bolts (3/8"-16 x 3" Carriage Bolts - not used for stove installations)

Order of Installation

1Attach the legs or pedestal (see page 26)

2If the heater is to use propane, install the propane conversion kit (see page 31)

3 Position the heater, use floor protection if needed

4 Attach any optional equipment.

5 Connect the gas line. Connect the gas vent.

6 Follow the instructions under "Finalizing the Installation" on pages 14 and 15.

Stove Clearances

Straight Installations

Corner Installations

When installed with this clearance, the vent is 6-1/4" from the back wall, 19-1/2" from the side wall.

10" Min.

4" Min.

When installed with this clearance, the vent is 13-1/2" from the wall.

4" Min.

45¡

Image 6
Contents Chelan B-Vent 2 Safety Precautions ¥ if YOU Smell GASSafety Precautions 4 Table of Contents Heating Specifications Features and SpecificationsInstallation Options Features DimensionsOrder of Installation Installation PreparationItems Required for Installation Items Packed with the Chelan 700 B-VentFloor Protection Heater Placement RequirementsGas Line Installation Gas Inlet PressureVent Requirements Vent Termination RequirementsElectrical Connection Re-Routing the Power Cord to the Front Items Packed with the Heater10 Insert Installation CONT. For qualified installers only Insert Placement Insert Must be Placed 13 into FireplaceGas Line Install Gas Line ConnectionFuel Zero Clearance Twig Installation 14 Finalizing the InstallationLog Installation Ember InstallationFinalizing the Installation CONT. Heater. Leak test allLocation of Controls See explanation below 16 Operating Your HeaterBefore You Begin Gas Control ValveOperating Your Heater Starting The Pilot FlameStarting the Heater for the First Time Adjusting the Flame Height18 Operating Your Heater Turning the Heater On and OffBlower Adjusting the Blower SpeedNormal Operating Sounds Pilot FlameYearly Service Procedure 20 Maintaining Your HeaterMaintaining Your Stoves Appearance Troubleshooting Problem Possible CauseUntil You What Turns the Main Burners On and Off 22 TroubleshootingHow this Heater Works What Prevents Gas BuildupWhy Nothing Should Be Placed Against the Heater Wiring Diagram24 Warranty Years 1 & 2 Coverage Parts & LaborListing Information TM B-VENTPedestal Installation Telescoping Leg Installation Part number26 Optional Equipment Surround Panel Installation Optional Equipment28 Optional Equipment RobertshawRemote Thermostat Outside Air Kit30 Optional Equipment Items Needed For AssemblyInstallation Instructions Propane Conversion KitOptional Equipment 32 Optional Equipment Orifice IdentificationOFF 34 Index