Avalon Stoves 700 B-VENT manual Off

Page 33

OPTIONAL EQUIPMENT (CONTINUED) PAGE 33

7Replace the pilot assembly (follow the instructions in step 6 in reverse order). Make sure the pilot assembly gasket is placed correctly.

8Replace the rear log shelf (see step 2). Install the logs and embers. Replace the door.

9Remove the regulator from the front of the gas control valve. Replace with the propane regulator, using the new gasket and screws included with the regulator. NOTE: Leak test this area after the heater is installed, gas is connected, and the main burner is lit.

Align the regulator gasket so it is flat and the two tabs fit through the two holes on the gasket.

ON

T

OFF

P

O

 

L I

 

PILOT ADJ

NOTE: These holes strip easily. Use a hand screwdriver and tighten each screw evenly.

 

These screws hold the

VENT

regulator in place.

NOTE: use the new

 

HI

screws included with

LO

the regulator.

VENT

 

 

 

 

HI

 

Phillips

LO

 

 

 

Screwdriver

 

Regulator Gasket

 

LP (propane) regulators have a

NOTE: use the new gasket

included with the regulator.

11.0 2.8 stamped here.

10Place the included propane label over the natural gas label on top of the gas control valve.

THIS CONTROL

HAS BEEN

CONVERTED TO

LP

11Make the gas line connection, start the heater and thoroughly leak-test all gas connections and the regulator. Check the pilot. Adjust if necessary.

The pilot flame should impinge the top 3/8Ó of the thermopile. If it does not, you may need to turn the pilot up.

To adjust the pilot flame, remove the cover screw (and gasket) and turn the needle valve. Clockwise lowers the flame while counter-clockwise raises it.

Thermopile

Pilot Hood

3/8Ó

Thermocouple

ON

T

 

 

OFF

 

 

P

O

L

 

 

I

 

PILOT ADJ

Cover Screw Gasket

 

 

 

The cover screw and

 

 

 

gasket must be

 

 

 

replaced to prevent gas

 

from leaking

 

 

 

Needle Valve

Micro (1/16Ó)

Standard

Screwdriver

Cover Screw

Standard

Screwdriver

Image 33
Contents Chelan B-Vent ¥ if YOU Smell GAS 2 Safety PrecautionsSafety Precautions 4 Table of Contents Installation Options Features Features and SpecificationsHeating Specifications DimensionsItems Required for Installation Installation PreparationOrder of Installation Items Packed with the Chelan 700 B-VentGas Line Installation Heater Placement RequirementsFloor Protection Gas Inlet PressureVent Requirements Vent Termination RequirementsElectrical Connection Items Packed with the Heater Re-Routing the Power Cord to the Front10 Insert Installation CONT. For qualified installers only Insert Must be Placed 13 into Fireplace Insert PlacementGas Line Install Gas Line ConnectionFuel Zero Clearance Log Installation 14 Finalizing the InstallationTwig Installation Ember InstallationHeater. Leak test all Finalizing the Installation CONT.Before You Begin 16 Operating Your HeaterLocation of Controls See explanation below Gas Control ValveStarting The Pilot Flame Operating Your Heater18 Operating Your Heater Adjusting the Flame HeightStarting the Heater for the First Time Turning the Heater On and OffNormal Operating Sounds Adjusting the Blower SpeedBlower Pilot FlameYearly Service Procedure 20 Maintaining Your HeaterMaintaining Your Stoves Appearance Troubleshooting Problem Possible CauseUntil You How this Heater Works 22 TroubleshootingWhat Turns the Main Burners On and Off What Prevents Gas BuildupWiring Diagram Why Nothing Should Be Placed Against the HeaterYears 1 & 2 Coverage Parts & Labor 24 WarrantyTM B-VENT Listing InformationPedestal Installation Telescoping Leg Installation Part number26 Optional Equipment Optional Equipment Surround Panel InstallationRobertshaw 28 Optional EquipmentOutside Air Kit Remote ThermostatInstallation Instructions Items Needed For Assembly30 Optional Equipment Propane Conversion KitOptional Equipment Orifice Identification 32 Optional EquipmentOFF 34 Index