Ferguson JWSH100250 Installation of Vent System, Vent Pipe Preparation, Initial Preparation

Page 10

INSTALLATION OF VENT SYSTEM

WARNING

THE OPTIONAL INTAKE VENTING ARRANGEMENT AND THE EXHAUST VENTING ARRANGEMENT MUST BE INSTALLED TO

RUN DIRECTLY TO THE OUTDOORS AND NOT IN ANY WAY BE CONNECTED TO ANOTHER VENTING SYSTEM (I.E. FURNACE,

DRYERS OR SPACE HEATERS). IT IS CRUCIAL THAT THE VENTING ARRANGEMENT BE KEPT SEPARATE FROM OTHER VENTING SYSTEMS. IF THIS WARNING IS IGNORED, AND THE SYSTEM IS

VENTED INCORRECTLY, IT MAY CAUSE IMPROPER OPERATION, FIRE, EXPLOSION, OR ASPHYXIATION.

1.Plan the route of the vent system from the vent termination to the planned location of the appliance. Layout the total vent system to use the minimum of vent pipe and elbows possible.

2.The installer may add up to a MAXIMUM OF FIFTY (50) EQUIVALENT FEET (15.2 m) of 3" pipe to the exhaust venting arrangement. This addition of FIFTY (50) EQUIVALENT FEET (15.2 m) of pipe on both the intake venting arrangement and exhaust venting arrangement must include any 3" PVC elbows which equals (5) EQUIVALENT FEET (1.5 m) of pipe.

Table 2. VENT LENGTH TABLE

Number

3"

3"

4"

of 90°

Minimum

Maximum

Maximum

Elbows

Pipe (Ft./M.)

Pipe (Ft./M.)

Pipe (Ft./M.)

ONE (1)

7/2

45/13.7

115/35

TWO (2)

7/2

40/12.2

110/33.5

THREE (3)

7/2

35/10.7

105/32

FOUR (4)

7/2

30/9.1

100/30.5

FIVE (5)

7/2

---

95/29

SIX (6)

7/2

---

90/27.4

4" PVC may be used for a MAXIMUM intake of ONE HUNDRED TWENTY

(120)EQUIVALENT FEET (36.6m) and a MAXIMUM exhaust of ONE HUNDRED TWENTY (120) EQUIVALENT FEET (36.6m). The maximum number of 90° elbows with the 4" venting is six (6) on the intake and six (6) on the exhaust. A 90° elbow is equal to five (5) equivalent feet (1.5m) of pipe. One (1) 90° elbow is equal to two (2) 45° elbows. Any venting configuration using less than 50 equivalent feet should use 3" venting. See Table 2. For either vent diameter, the maximum vent lengths in Table 2 are EXCLUSIVE of the factory-installed vent component and prescribed terminations. That is, the equivalent vent lengths associated with the 90° elbow (installed on the unit) and the 45° termination elbow should NOT be considered part of the vent lengths referred to in Table 2.

The 3" venting terminals (provided) must be used with the 3" vent pipe. Two, approved 4" vent terminals (not provided) must be used with 4" vent pipe. See replacement parts list for terminals.

IMPORTANT

When multiple units are direct vented through a wall (3" or 4" venting), no intake air terminal should be lower than the highest exhaust vent terminal.

NOTE: This water heater can only be vented with PVC pipe certified and

marked as complying with ULC S636 and glued with IPEX System 636 CPVC Cement Product .

NOTE: for Water Heaters in locations with high ambient temperatures (above 100°F or 38°C) and/or insufficient dilution air, it is recommended that CPVC pipe and fittings marked ULC S636 compliant (MUST USE SUPPLIED VENT TERMINAL) be used.

4.It is important that condensate not be allowed to buildup in the exhaust vent pipe. To prevent this from happening the pipe should be installed with a slight, 1/8" (3mm) per 5' (152 cm) of pipe maximum downward (toward terminal) slope.

5.The vent system should be supported every 5' (152 cm) of vertical run and every 3' (91cm) of horizontal run of vent pipe length.

NOTE: Stress levels in the pipe and fittings can be significantly increased by improper installation. If rigid pipe clamps are used to hold the pipe in place, or if the pipe cannot move freely through a wall penetration, the pipe may be directly stressed, or high thermal stresses may be formed when the pipe heats up and expands. Install accordingly to minimize such stresses.

VENT PIPE PREPARATION

1.INITIAL PREPARATION

A.Make sure the solvent cement you are planning to use is designed for the specific application you are attempting.

B.Know the physical and chemical characteristics and limitations of the PVC or CPVC piping materials that you are about to use.

C.Know the reputation of your pipe and cement manufacturer and their products.

D.Know your own qualifications or those of your contractor. The solvent welding technique of joining PVC or CPVC pipe is a specialized skill just as any other pipe fitting technique.

E.Closely supervise the installation and inspect the finished job before start-up.

F.Contact the manufacturer, supplier, or competent consulting agency if you have any questions about the application or installation of PVC or CPVC pipe.

G.Take the time and effort to do a professional job. Shortcuts will only cause you problems and delays in start-up. The majority of failures in these systems are the result of shortcuts and/or improper joining techniques.

2.SELECTION OF MATERIALS

PRIMER

It is recommended that Tetrahydrofuran (THF) be used to prepare the surfaces

of pipe and fittings for solvent welding. Do not use water, rags, gasoline or

any other substitutes for cleaning PVC or CPVC surfaces. A chemical cleaner

such as MEK may be used.

CEMENT

The only cement approved for this system is IPEX System 636 CPVC Cement

Product for use on marked PVC and CPVC ULC S636 pipe and fittings.

SAFETY PRECAUTION: PRIMERS AND CEMENTS ARE EXTREMELY FLAMMABLE AND MUST NOT BE STORED OR USED NEAR HEAT OR OPEN FLAME. ALSO, USE ONLY IN A WELL-VENTILATED AREA.

10

Image 10
Contents Models AJWSH100150 Thru AJWSH100250 PrintedModels AJWSH100150 Thru AJWSH100250 ROUGH-IN-DIMENSIONS ForewordTable of Contents FeaturesInstallation Instructions Locating the Heater ClearancesMechanical Exhausting of Room AIR Hard WaterAIR Requirements Unconfined SpaceCanadian Power Vent Canadian Direct Vent Masonry Side Walls Direct Vent Terminal InstallationDirect Venting Wooden Side WallsVertical Vent Terminal Installation Installation SequenceInitial Preparation Installation of Vent SystemVent Pipe Preparation Selection of MaterialsControls and Switches GAS PipingConnection of GAS Pipe AJWSH100199 & AJWSH100250 Models OnlySystem Connections Heater Wiring Using the Electronic Controller OverviewOperating States Changing the Display Units Viewing the Fault History Prior to Start UPAdjustment Procedure Operating InstructionsMaintenance General InformationAJWSH100150 only AJWSH100199 & AJWSH100250 Models only Draining Powered Anode SystemFlushing Sediment RemovalDrain Valve and Access Panels Vent SystemInstallation Diagrams Page Must be Identical Heaters Page Page Manifold Kits Checklist and Service Information TROUBLE-SHOOTINGMotor RUNS, Burner Lights Momentarily Then Locks OUT Replacement PartsMotor will not RUN GAS Fails to Shut OFFModels AJWSH100150 thru AJWSH100250 Limited Warranty Page Page Hill Street West Fergus, on Canada N1M