Bradford-White Corp EF Series warranty Section VII GAS Connections, Selection of Materials

Page 31

SELECTION OF MATERIALS

PRIMER – It is recommended that Tetrahydrofuran (THF) be used to prepare the surfaces of pipe and fittings for solvent welding. Do not use water, rags, gasoline or any other substitutes for cleaning PVC cellular core, ABS or CPVC surfaces. A chemical cleaner such as MEK may be used.

CEMENT – The cement should be a bodied cement of approximately 500 to 1600 centipoises viscosity containing

10-20% (by weight) virgin PVC material solvated with tetrahydrofuran (THF). Small quantities of dimethylformamide (DMF) may be included to act as a retarding agent to extend curing time. Select the proper cement; Schedule 40 cement should be used for Schedule 40 pipe. Never use all-purpose cements, commercial glues and adhesives or ABS cement to join PVC or CPVC pipe and fittings.

SAFETY PRECAUTION: PRIMERS AND CEMENTS ARE EXTREMELY FLAMMABLE AND MUST NOT BE STORED OR USED NEAR HEAT OR OPEN FLAME. ALSO, USE ONLY IN A WELL VENTILATED AREA.

SECTION VII: GAS CONNECTIONS

WARNING

Connect this water heater only to the type of gas as shown on the rating plate. Use clean black iron pipe or equivalent material approved by local codes and ordinances. (Dirt and scale from the pipe can enter the gas valve and cause it to malfunction). The inlet gas line must have at least a 3 inch (7.62 cm) drip leg (sediment trap) installed as close to the water heater’s gas valve as possible. A ground joint union must be installed in the gas supply line, as close to the water heater as possible, to permit servicing of the water heater. Compounds used on the threaded joints of the gas piping must be resistant to the action of liquefied petroleum gases/propane gas. DO NOT apply pipe dope to the gas valve inlet and make certain that no pipe dope has become lodged in the inlet screen of the gas valve. Extreme care must be taken to ensure no pipe dope enters the gas valve and to avoid excessive torque when tightening the gas supply line to the gas valve. Excessive torque may result in cracking of the gas valve housing. The suggested maximum torque is 31.5 foot lbs. (4.4 kg -m). The manufacturer of this water heater will not be liable for any damage or injury caused as a result of a cracked gas inlet as a result of excessive torque.

This water heater and its gas connection must be leak tested before placing the water heater in operation. Check for gas leaks with a soap and water solution and a brush or a commercial leak detector fluid.

NEVER USE A MATCH OR OPEN FLAME FOR TESTING!

The water heater is not intended for operation at higher than 14.0 inch water column (½ psi) supply gas pressure. Higher gas supply pressures require supplemental reducing service regulation. Exposure to higher gas supply pressure may cause damage to the gas controls which could result in fire or explosion. If overpressure has occurred such as through improper testing of gas lines or emergency malfunction of the supply system, the gas valve must be checked for safe operation. Make sure that the outside vents on the supply regulators and the safety vent valves are protected against blockage. These are parts of the gas supply system, not the water heater.

CAUTION

The water heater and individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of the system at test pressures in excess of ½ psi (3.5 kPa). The water heater must be isolated from the gas supply piping system by closing its manual shutoff valve during any pressure testing of the gas supply system at test pressures equal to or less than ½ psi (3.5 kPa). The supply line must be capped when not connected to the water heater.

If copper supply lines are used, they must be internally tinned and certified for gas service.

31

Image 31
Contents What to do if YOU Smell GAS With Troubleshooting GuideTable of Contents Page Do not Operate the Appliance Until the Leakage is Corrected If YOU Smell GASSection SpecificationsSection III General Information FeaturesTemperature and Pressure Relief Valve Condensate Elbow With Loop Dishwashing Machine RequirementsSection IV Installation Instructions Minimum Clearance To Combustible UnpackingRemove Crate LocationAIR Requ Rements Chemical Vapor Corrosion Mechanical Exhausting of Room AIRUnconfined Space Confined SpaceTypical Front Inlet Connection Typical Installation IllustrationTypical Two Water Heater Connection Instructions for Connections Section V Water ConnectionsScalding Approximate TIME/TEMPERATURE Relationships in ScaldsAlternate Space Heating Connections Alternate Space Heating Water ConnectionsSection VI Venting Typical Plumbing Schematic for Zoned HeatingVenting Direct Vent InstallationExceptions for Installations Page Typical Horizontal Direct Vent System Typical Vertical Direct Vent System Installation Direct Vent Maximum Vent Length Power Vent InstallationTypical Horizontal Power Vent System Typical Vertical Power Vent System Installation Coaxial Venting Installation Procedure Power Vent Maximum Vent Length Dimensional Layout of Concentric Vent Kit Concentric Vent Roof Top Attachment Initial Preparation Vent Pipe PreparationSelection of Materials Section VII GAS ConnectionsGAS Pressure Regulation GAS Meter Size Natural Gases onlySection Viii Electrical Connections Wiring Diagram and SchematicSequence of Operation Section IX Operating InstructionsGeneral Instructions To Fill the Water HeaterLighting Instructions Temperature Adjustm NTSight Glass Location Burner Flame CheckMaintenance Schedule Section X MaintenanceGeneral Sediment and Lime Scale Removal Flushing Water HeaterDraining Water Heater Filling Water HeaterDrain Valve and Tank Access Panel Anode Inspection and ReplacementRelief Valve Combustion System Inspection Vent and AIR Intake SystemReference Section XI Troubleshooting GuideIs there continuity across the Hot Surface Ignitor? If EF Series Water Heater Section XI Parts ListCombustion Surround Assy CC Ignition Control Assy