SECTION V: WATER CONNECTIONS

WARNING

Failure to install and maintain a new, listed temperature and pressure relief valve will release the manufacturer from any claim, which might result from excessive temperature and pressures.

Hydrogen gas can be produced in an operating water heater that has not had water drawn from the tank for a long period of time (generally two weeks or more). HYDROGEN GAS IS EXTREMELY FLAMMABLE. To prevent the possibility of injury under these conditions, we recommend the hot water faucet to be open for several minutes at the kitchen sink before you use any electrical appliance, which is connected to the hot water system. If hydrogen is present, there will be an unusual sound such as air escaping through the pipes as hot water begins to flow. Do not smoke or have open flame near the faucet at the time it is open.

Keep clear of the combination temperature and pressure relief valve discharge line outlet. The discharge may be hot enough to cause scald injury. The water is under pressure and may splash.

CAUTION

If sweat fittings are to be used, DO NOT apply heat to the nipples in front or side of the water heater. Sweat the tubing to the adapter before fitting the adapter to the water connections. It is imperative that heat is not applied to the nipples containing a plastic liner.

INSTRUCTIONS FOR CONNECTIONS

1.BEFORE PROCEEDING WITH THE INSTALLATION, CLOSE THE MAIN WATER SUPPLY VALVE. After shutting off the main water supply, open a faucet to relieve the water line pressure to prevent any water from leaking out of the pipes while making the water connections to the water heater. The COLD water inlet and HOT water outlet are identified on the water heater. Make the proper plumbing connections between the water heater and the plumbing system to the house. Install a shut-off valve in the cold water supply line.

2.If this water heater is installed in a closed water supply system, such as the one having a back-flow preventer in the cold water supply, provisions must be made to control thermal expansion. DO NOT operate this water heater in a closed system without provisions for controlling thermal expansion.

Warranties do not cover damages from thermal expansion such as pressure bulges and/or deformities. Your water supplier or local plumbing inspector should be contacted on how to control this situation.

3.After installation of the water lines, open the main water supply valve and fill the water heater. While the water heater is filling, open several hot water faucets to allow air to escape from the water system. When a steady stream of water flows through the faucets, close them and check all water connections for possible leaks.

4.Never operate the water heater without first being certain it is filled with water.

15

Image 15
Contents What to do if YOU Smell GAS With Troubleshooting GuideTable of Contents Page Do not Operate the Appliance Until the Leakage is Corrected If YOU Smell GASSection SpecificationsSection III General Information FeaturesTemperature and Pressure Relief Valve Condensate Elbow With Loop Dishwashing Machine RequirementsSection IV Installation Instructions Minimum Clearance To Combustible UnpackingLocation Remove CrateAIR Requ Rements Chemical Vapor Corrosion Mechanical Exhausting of Room AIR Unconfined Space Confined SpaceTypical Front Inlet Connection Typical Installation IllustrationTypical Two Water Heater Connection Instructions for Connections Section V Water ConnectionsScalding Approximate TIME/TEMPERATURE Relationships in ScaldsAlternate Space Heating Connections Alternate Space Heating Water ConnectionsSection VI Venting Typical Plumbing Schematic for Zoned HeatingVenting Direct Vent InstallationExceptions for Installations Page Typical Horizontal Direct Vent System Typical Vertical Direct Vent System Installation Direct Vent Maximum Vent Length Power Vent InstallationTypical Horizontal Power Vent System Typical Vertical Power Vent System Installation Coaxial Venting Installation Procedure Power Vent Maximum Vent LengthDimensional Layout of Concentric Vent Kit Concentric Vent Roof Top Attachment Initial Preparation Vent Pipe PreparationSelection of Materials Section VII GAS ConnectionsGAS Pressure Regulation GAS Meter Size Natural Gases onlySection Viii Electrical Connections Wiring Diagram and SchematicSequence of Operation Section IX Operating InstructionsGeneral Instructions To Fill the Water HeaterLighting Instructions Temperature Adjustm NTSight Glass Location Burner Flame CheckSection X Maintenance Maintenance ScheduleGeneral Sediment and Lime Scale Removal Flushing Water HeaterDraining Water Heater Filling Water HeaterAnode Inspection and Replacement Drain Valve and Tank Access PanelRelief Valve Combustion System Inspection Vent and AIR Intake SystemReference Section XI Troubleshooting GuideIs there continuity across the Hot Surface Ignitor? If EF Series Water Heater Section XI Parts ListCombustion Surround Assy CC Ignition Control Assy