Bradford-White Corp EF Series Section Viii Electrical Connections, Wiring Diagram and Schematic

Page 33

SECTION VIII: ELECTRICAL CONNECTIONS

WARNING

Turn off or disconnect the electrical power supply to the water heater before servicing. Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

All electrical wiring must be installed and grounded in accordance with local codes, or in the absence of local codes, the National Electrical Code, ANSI/NFPA 70 and/or CSA C22.2 Electrical Code.

The water heater must be wired to a 120 VAC, 60 Hz, 15A power supply. The water heater should be connected to a GFI outlet and wired on a separate circuit and breaker. If a flexible line cord and plug is permitted by local code, then provide a three wire GFI grounding type receptacle within reach of the line cord provided on the control box. Do not plug the line cord into a receptacle that can have the power supply interrupted by a switch that is used to control lights or another appliance.

If wiring in conduit is required, remove the line cord and strain relief bushing in the control panel and install an electrical conduit connector. Connect the hot, neutral, and ground leads to the terminal block using quick connect terminals. Refer to the wiring diagram for the correct terminal locations for each wire lead.

CAUTION

Do not energize the electric circuit before the water heater tank is filled with water.

This controller is Polarity sensitive. If the Hot and Neutral Supply voltage is reversed, the controller will not sense flame and the water heater will not operate. Verify polarity before connecting the water heater.

WIRING DIAGRAM AND SCHEMATIC

Figure 25. Wiring Diagram and Schematic

33

Image 33
Contents What to do if YOU Smell GAS With Troubleshooting GuideTable of Contents Page Do not Operate the Appliance Until the Leakage is Corrected If YOU Smell GASSection SpecificationsSection III General Information FeaturesTemperature and Pressure Relief Valve Condensate Elbow With Loop Dishwashing Machine RequirementsSection IV Installation Instructions Minimum Clearance To Combustible UnpackingLocation Remove CrateAIR Requ Rements Unconfined Space Mechanical Exhausting of Room AIRConfined Space Chemical Vapor CorrosionTypical Front Inlet Connection Typical Installation IllustrationTypical Two Water Heater Connection Instructions for Connections Section V Water ConnectionsScalding Approximate TIME/TEMPERATURE Relationships in ScaldsAlternate Space Heating Connections Alternate Space Heating Water ConnectionsSection VI Venting Typical Plumbing Schematic for Zoned HeatingVenting Direct Vent InstallationExceptions for Installations Page Typical Horizontal Direct Vent System Typical Vertical Direct Vent System Installation Direct Vent Maximum Vent Length Power Vent InstallationTypical Horizontal Power Vent System Typical Vertical Power Vent System Installation Coaxial Venting Installation Procedure Power Vent Maximum Vent LengthDimensional Layout of Concentric Vent Kit Concentric Vent Roof Top Attachment Initial Preparation Vent Pipe PreparationSelection of Materials Section VII GAS ConnectionsGAS Pressure Regulation GAS Meter Size Natural Gases onlySection Viii Electrical Connections Wiring Diagram and SchematicGeneral Instructions Section IX Operating InstructionsTo Fill the Water Heater Sequence of OperationLighting Instructions Temperature Adjustm NTSight Glass Location Burner Flame CheckSection X Maintenance Maintenance ScheduleGeneral Draining Water Heater Flushing Water HeaterFilling Water Heater Sediment and Lime Scale RemovalAnode Inspection and Replacement Drain Valve and Tank Access PanelRelief Valve Combustion System Inspection Vent and AIR Intake SystemReference Section XI Troubleshooting GuideIs there continuity across the Hot Surface Ignitor? If EF Series Water Heater Section XI Parts ListCombustion Surround Assy CC Ignition Control Assy