Bradford-White Corp THROUGH-THE-WALL GAS WATER HEATER instruction manual

Page 43

d)Cementing must be done quickly to avoid over-drying before joining.

i)Apply one coat to the outside end of the pipe at a width slightly greater than the depth of the socket.

ii)Apply a coat around the inside of the fitting socket.

iii)Apply a second coat around the end of the pipe.

4)Joining

a)Joints should be made immediately after cement is applied.

b)After fully inserting pipe into fitting socket, give pipe about ¼ turn to help spread cement evenly. Hold joint together for about 15 to 20 seconds.

c)Remove excess cement from around pipe and fitting with a clean rag.

d)Cement drying times may vary. Be sure to allow for the recommended drying time before disturbing joints.

For more specific and detailed information about the above, contact the manufacturer, supplier, or competent professional.

NOTES

43

Image 43
Contents TTW Installation and Operating Congratulations Table of Contents General Information Locating The Water Heater InstallationIf YOU Smell GAS Installation Locating The Water Heater Minimum Clearances Venting Exceptions For Installations in CanadaVenting System Condensation Model Service PartVenting Part Vent Connector Lengths Length Terminal Through the Roof Venting Vertical Venting Through the Wall VentingThrough the Wall Venting with LOW Ground Clearance Venting Part LOW Ground Clearance Installations Vent Connector Lengths for 3 7.6 cm Diameter PVC Terminating # of 90 Elbows Maximum Minimum Through the Wall Venting Through the Roof Venting Vertical Venting Through the Wall Venting with LOW Ground Clearance Ground Clearance Installations Cm Vent Connector Lengths from Inside Wall for LOWHigh Altitude Vent Connector Modifications Confined Spaces Combustion Air SupplyDo not Operate Appliance Until Leakage is Corrected Unconfined SpacesWater Connections Specially Engineered InstallationsCertain IT is Filled with Water Page Installation Water Connections Gas Connections Match or Open Flame for TestingElectrical Connections Electrical Connections Figure Electrical Connections Figure General Operation Lighting and shutdown instructions Burner Flame Check Thermostat AdjustmentMaintenance Maintenance Page Time That Parts and the Water Heater are Warranted Parts List Drawing Part Name and Description Page Vent Pipe Preparation and Joining