Bradford-White Corp THROUGH-THE-WALL GAS WATER HEATER Electrical Connections Figure

Page 32

Electrical Connections (Figure 12) continued-

Figure 12

32

Image 32
Contents TTW Installation and Operating Congratulations Table of Contents General Information Installation Locating The Water HeaterIf YOU Smell GAS Installation Locating The Water Heater Minimum Clearances Exceptions For Installations in Canada VentingModel Service Part Venting System CondensationVenting Part Vent Connector Lengths Length Terminal Through the Wall Venting Through the Roof Venting Vertical VentingThrough the Wall Venting with LOW Ground Clearance Venting Part LOW Ground Clearance Installations Vent Connector Lengths for 3 7.6 cm Diameter PVC Terminating # of 90 Elbows Maximum Minimum Through the Wall Venting Through the Roof Venting Vertical Venting Through the Wall Venting with LOW Ground Clearance High Altitude Vent Connector Modifications Cm Vent Connector Lengths from Inside Wall for LOWGround Clearance Installations Combustion Air Supply Do not Operate Appliance Until Leakage is CorrectedUnconfined Spaces Confined SpacesSpecially Engineered Installations Water ConnectionsCertain IT is Filled with Water Page Installation Water Connections Match or Open Flame for Testing Gas ConnectionsElectrical Connections Electrical Connections Figure Electrical Connections Figure General Operation Lighting and shutdown instructions Thermostat Adjustment Burner Flame CheckMaintenance Maintenance Page Time That Parts and the Water Heater are Warranted Parts List Drawing Part Name and Description Page Vent Pipe Preparation and Joining