Bradford-White Corp THROUGH-THE-WALL GAS WATER HEATER instruction manual Length Terminal

Page 13

TABLE 3 -VENT CONNECTOR LENGTHS

FOR 4” (10.2 cm) DIAMETER PVC

Terminating

# of 90° Elbows

Maximum

Minimum

 

(excluding vent

Length

Length

 

terminal)

 

 

Through the Wall

1

70 ft (21.3 m)

2 ft (.6 m)

Through the Wall

2

65 ft (19.8 m)

3 ft (.9 m)

Through the Wall

3

60 ft (18.3 m)

5 ft (1.5 m)

Through the Wall

4

55 ft (16.8 m)

8 ft (2.4 m)

Through the Wall

5

50 ft (15.3 m)

12 ft (3.6 m)

Through the Roof

1

70 ft (21.3 m)

2 ft (.6 m)

Through the Roof

2

65 ft (19.8 m)

3 ft (.9 m)

Through the Roof

3

60 ft (18.3 m)

5 ft (1.5 m)

Through the Roof

4

55 ft (16.8 m)

8 ft (2.4 m)

Through the Roof

5

50 ft (15.3 m)

12 ft (3.6 m)

NOTE: When using 4” (10.2 cm) PVC, use a 4” (10.1 cm) to 3” (7.6 cm) reducer and exit the building wall with 3” (7.6 cm) PVC using the 3” (7.6 cm) 90° vent terminal supplied. Two 45° elbows are equivalent to one 90° elbow.

Figure 2

IMPORTANT

All of the Venting connections must be leak checked with a soap and water solution upon initial start up of the water heater. Any leaks must be repaired before continuing operation of the water heater.

NOTE: ABS or CPVC pipes may be substituted for PVC pipe. Do not mix

ABS and PVC pipe in the same installation.

Venting (Part I) continued-

13

Image 13
Contents TTW Installation and Operating Congratulations Table of Contents General Information Locating The Water Heater InstallationIf YOU Smell GAS Installation Locating The Water Heater Minimum Clearances Venting Exceptions For Installations in CanadaVenting System Condensation Model Service PartVenting Part Vent Connector Lengths Length Terminal Through the Roof Venting Vertical Venting Through the Wall VentingThrough the Wall Venting with LOW Ground Clearance Venting Part LOW Ground Clearance Installations Vent Connector Lengths for 3 7.6 cm Diameter PVC Terminating # of 90 Elbows Maximum Minimum Through the Wall Venting Through the Roof Venting Vertical Venting Through the Wall Venting with LOW Ground Clearance Ground Clearance Installations Cm Vent Connector Lengths from Inside Wall for LOWHigh Altitude Vent Connector Modifications Do not Operate Appliance Until Leakage is Corrected Combustion Air SupplyUnconfined Spaces Confined SpacesWater Connections Specially Engineered InstallationsCertain IT is Filled with Water Page Installation Water Connections Gas Connections Match or Open Flame for TestingElectrical Connections Electrical Connections Figure Electrical Connections Figure General Operation Lighting and shutdown instructions Burner Flame Check Thermostat AdjustmentMaintenance Maintenance Page Time That Parts and the Water Heater are Warranted Parts List Drawing Part Name and Description Page Vent Pipe Preparation and Joining