Bradford-White Corp THROUGH-THE-WALL GAS WATER HEATER instruction manual Table of Contents

Page 3

TABLE OF CONTENTS

 

page

GENERAL INFORMATION

4

INSTALLATION

5

Locating The Water Heater

5

Minimum Clearances

8

Venting

9

Specifications for

 

48 Gal, 65,000 BTU input (189.3 L, 19.1 kW/Hr)

 

65 Gal, 65,000 BTU input (246.1 L, 19.1 kW/Hr)

 

75 Gal, 76,000 BTU input (283.9 L, 22.3 kW/Hr)

12

Specifications for

 

40 Gal, 40,000 BTU input (151.4 L, 11.7 kW/Hr)

 

48 Gal, 40,000 BTU input (189.3 L, 11.7 kW/Hr)

18

Combustion Air Supply

24

Water Connections

26

Gas Connections

29

Electrical Connections

30

Wiring Diagram for

 

48 Gal, 65,000 BTU input (189.3 L, 19.1 kW/Hr)

 

65 Gal, 65,000 BTU input (246.1 L, 19.1 kW/Hr)

 

75 Gal, 76,000 BTU input (283.9 L, 22.3 kW/Hr)

31

Wiring Diagram for

 

40 Gal, 40,000 BTU input (151.4 L, 11.7 kW/Hr)

 

48 Gal, 40,000 BTU input (189.3 L, 11.7 kW/Hr)

32

GENERAL OPERATION

33

Lighting and Shutdown Instructions

34

Thermostat Adjustment

35

Burner Flame Check

36

MAINTENANCE

37

PARTS LIST DRAWING

40

PARTS LIST

40

INSTALLATION INSTRUCTIONS FOR POTABLE WATER AND

 

SPACE HEATING

41

VENT PIPE PREPARATION AND JOINING

42

NOTES

44

3

 

Image 3
Contents TTW Installation and Operating Congratulations Table of Contents General Information Locating The Water Heater InstallationIf YOU Smell GAS Installation Locating The Water Heater Minimum Clearances Venting Exceptions For Installations in CanadaVenting System Condensation Model Service PartVenting Part Vent Connector Lengths Length Terminal Through the Roof Venting Vertical Venting Through the Wall VentingThrough the Wall Venting with LOW Ground Clearance Venting Part LOW Ground Clearance Installations Vent Connector Lengths for 3 7.6 cm Diameter PVC Terminating # of 90 Elbows Maximum Minimum Through the Wall Venting Through the Roof Venting Vertical Venting Through the Wall Venting with LOW Ground Clearance Cm Vent Connector Lengths from Inside Wall for LOW Ground Clearance InstallationsHigh Altitude Vent Connector Modifications Confined Spaces Combustion Air SupplyDo not Operate Appliance Until Leakage is Corrected Unconfined SpacesWater Connections Specially Engineered InstallationsCertain IT is Filled with Water Page Installation Water Connections Gas Connections Match or Open Flame for TestingElectrical Connections Electrical Connections Figure Electrical Connections Figure General Operation Lighting and shutdown instructions Burner Flame Check Thermostat AdjustmentMaintenance Maintenance Page Time That Parts and the Water Heater are Warranted Parts List Drawing Part Name and Description Page Vent Pipe Preparation and Joining