Bradford-White Corp THROUGH-THE-WALL GAS WATER HEATER instruction manual

Page 15

Cut the necessary holes through the roof and ceiling and install the vent connector as shown in Figure 4. Make sure that the installation meets the local codes and/or The National Fuel Gas Code ANSI Z223.1 (Latest Edition) or CGA/CAN B149 Installation Code.

Figure 4

NOTE: For installations requiring both horizontal and vertical runs, the

following rule must be followed: Total number of feet of straight pipe (both horizontally and vertically) must not exceed the allowable length listed in the “Through The Wall” section of the table for total number of elbows used. Also: Total number of vertical feet of straight pipe must not exceed the allowable length listed in the “Through The Roof” section of the table for total number of elbows used. For angular rises in venting, any angle that is greater than or equal to 45° from the horizontal should be considered a vertical rise.

Venting (Part I) continued-

THROUGH THE WALL VENTING WITH LOW GROUND CLEARANCE:

15

Image 15
Contents TTW Installation and Operating Congratulations Table of Contents General Information Locating The Water Heater InstallationIf YOU Smell GAS Installation Locating The Water Heater Minimum Clearances Venting Exceptions For Installations in CanadaVenting System Condensation Model Service PartVenting Part Vent Connector Lengths Length Terminal Through the Roof Venting Vertical Venting Through the Wall VentingThrough the Wall Venting with LOW Ground Clearance Venting Part LOW Ground Clearance Installations Vent Connector Lengths for 3 7.6 cm Diameter PVC Terminating # of 90 Elbows Maximum Minimum Through the Wall Venting Through the Roof Venting Vertical Venting Through the Wall Venting with LOW Ground Clearance Cm Vent Connector Lengths from Inside Wall for LOW Ground Clearance InstallationsHigh Altitude Vent Connector Modifications Confined Spaces Combustion Air SupplyDo not Operate Appliance Until Leakage is Corrected Unconfined SpacesWater Connections Specially Engineered InstallationsCertain IT is Filled with Water Page Installation Water Connections Gas Connections Match or Open Flame for TestingElectrical Connections Electrical Connections Figure Electrical Connections Figure General Operation Lighting and shutdown instructions Burner Flame Check Thermostat AdjustmentMaintenance Maintenance Page Time That Parts and the Water Heater are Warranted Parts List Drawing Part Name and Description Page Vent Pipe Preparation and Joining