Bradford-White Corp THROUGH-THE-WALL GAS WATER HEATER instruction manual Maintenance

Page 36

Cast Iron Burner: At the time of installation and at periodic intervals (not more than 6 months), a visual check of the main burner and pilot flames should be made to determine if they are burning properly. For ideal operation, the gas and air must be properly proportioned. The proper air-gas mixture is obtained by adjusting the air shutter on the mixer face of the main burner (See Figure 14). To adjust for proper burning, loosen the air shutter nut (if provided), rotate shutter to close the opening in the burner then slowly rotate the shutter until the yellow tips disappear and the flame becomes blue. On 75 gallon models fired on LPG or propane, adjust the air shutter as described above until the yellow flame is minimized (note-the burner flame may contain a mixture of yellow and blue). Tighten the air shutter nut (if provided). Too much air will cause the flame to lift off the burner ports and create noisy operation. Too little air will result in soot formation. The main burner flame should light smoothly from the pilot.

Steel Burner: These models are equipped with self adjusting air mixture and do not have an adjustable air shutter (See Figure 14). At periodic intervals a visual check of the main burner and pilot flames should be made to determine if they are burning properly. The main burner flame should light smoothly from the pilot.

Figure 14

MAINTENANCE

36

Image 36
Contents TTW Installation and Operating Congratulations Table of Contents General Information Installation Locating The Water HeaterIf YOU Smell GAS Installation Locating The Water Heater Minimum Clearances Exceptions For Installations in Canada VentingModel Service Part Venting System CondensationVenting Part Vent Connector Lengths Length Terminal Through the Wall Venting Through the Roof Venting Vertical VentingThrough the Wall Venting with LOW Ground Clearance Venting Part LOW Ground Clearance Installations Vent Connector Lengths for 3 7.6 cm Diameter PVC Terminating # of 90 Elbows Maximum Minimum Through the Wall Venting Through the Roof Venting Vertical Venting Through the Wall Venting with LOW Ground Clearance Cm Vent Connector Lengths from Inside Wall for LOW Ground Clearance InstallationsHigh Altitude Vent Connector Modifications Combustion Air Supply Do not Operate Appliance Until Leakage is CorrectedUnconfined Spaces Confined SpacesSpecially Engineered Installations Water ConnectionsCertain IT is Filled with Water Page Installation Water Connections Match or Open Flame for Testing Gas ConnectionsElectrical Connections Electrical Connections Figure Electrical Connections Figure General Operation Lighting and shutdown instructions Thermostat Adjustment Burner Flame CheckMaintenance Maintenance Page Time That Parts and the Water Heater are Warranted Parts List Drawing Part Name and Description Page Vent Pipe Preparation and Joining