Bradford-White Corp THROUGH-THE-WALL GAS WATER HEATER Installation Water Connections

Page 28

Installation (Water Connections) continued-

WARNING

Hydrogen gas can be produced in an operating water heater that has not had water drawn from the tank for a long period of time (generally two weeks or more). Hydrogen gas is extremely flammable. To prevent the possibility of injury under these conditions, we recommend the hot water faucet to be open for several minutes at the kitchen sink before you use any electrical appliance which is connected to the hot water system. If hydrogen is present, there will be an unusual sound such as air escaping through the pipes as hot water begins to flow. Do not smoke or have open flame near the faucet at the time it is open.

This water heater can deliver scalding temperature water at any faucet in the system. Be careful whenever using hot water to avoid scalding injury. Certain appliances such as dishwashers and automatic clothes washers may require increased temperature water. By setting the thermostat on this water heater to obtain the increased temperature water required by these appliances, you may create the potential for scald injury. To protect against injury, you should install an ASSE approved mixing valve in the water system. This valve will reduce point of discharge temperature by mixing cold and hot water in branch supply lines. Such valves are available from the manufacturer of this water heater or a local plumbing supplier. Please consult with a plumbing professional.

28

Image 28
Contents TTW Installation and Operating Congratulations Table of Contents General Information Installation Locating The Water HeaterIf YOU Smell GAS Installation Locating The Water Heater Minimum Clearances Exceptions For Installations in Canada VentingModel Service Part Venting System CondensationVenting Part Vent Connector Lengths Length Terminal Through the Wall Venting Through the Roof Venting Vertical VentingThrough the Wall Venting with LOW Ground Clearance Venting Part LOW Ground Clearance Installations Vent Connector Lengths for 3 7.6 cm Diameter PVC Terminating # of 90 Elbows Maximum Minimum Through the Wall Venting Through the Roof Venting Vertical Venting Through the Wall Venting with LOW Ground Clearance Ground Clearance Installations Cm Vent Connector Lengths from Inside Wall for LOWHigh Altitude Vent Connector Modifications Combustion Air Supply Do not Operate Appliance Until Leakage is CorrectedUnconfined Spaces Confined Spaces Specially Engineered Installations Water ConnectionsCertain IT is Filled with Water Page Installation Water Connections Match or Open Flame for Testing Gas ConnectionsElectrical Connections Electrical Connections Figure Electrical Connections Figure General Operation Lighting and shutdown instructions Thermostat Adjustment Burner Flame CheckMaintenance Maintenance Page Time That Parts and the Water Heater are Warranted Parts List Drawing Part Name and Description Page Vent Pipe Preparation and Joining