C: INSTALLING THE OPERATOR

STEP 13: CONFIGURE MCB FOR SAFE FINISH OR ELECTRIC EDGE OPERATION

If you have not installed a Safe Finish Photosystem or Electric Edge at this time proceed to Step 15 on Page 13.

In order for your Safe Finish Photosystem or Electric Edge to work properly you must configure the motor control board to work with these devices.

Make sure the power is disconnected from the operator and remove the unit’s cover. Locate the motor control board inside of the operator. Locate the Obstruction Jumper on the Control Board using the diagram at right. The Obstruction Jumper is a simple wire jumper located close the center of the motor control board. The letters “OBS” are silk-screened on the board just above the jumper and the letters “SW2” are silk-screened on the board just to the left the jumper.

With a small wire cutter cut this jumper in half and separate the two halves so they do not touch.

Location of Obstruction Jumper on MCB

OPERATOR MOTOR CONTROL BOARD

The motor control board is now configured for Safe Finish Photosystem or an Electric Edge operation.

STEP 14: ALIGNMENT AND INITIAL TEST OF SAFE FINISH PHOTOSYSTEM

AT THIS POINT PLUG CONNECT THE POWER TO THE OPERATOR.

A.Connect the power to the Garage Door Opener. Keep a portable transmitter with you to control the garage door opener. The red light on the receiver unit should now be on. If not, recheck that the mounting screws are tight then, if necessary, align the photosystem by slightly bending the wall bracket until proper operation is obtained.

B.Place an object (packing insert box or a similar object at least eight inches high) one foot in front of the transmitter or receiver. The red LED should go OFF and remain OFF until the object is removed. NOTE: There may be a slight delay in returning to normal depending upon how long the photosystem was blocked. If the light fails to go off when the object is placed in the path of the beam check the wire connections and the installation height of the units (see Steps 11 and 12).

C.Move to the center of the door. Make sure the red LED light is on. Move a solid object slowly through the beam. The LED should go OFF and then ON.

D.Using the pushbutton or transmitter, activate the opener and check that it will operate through the full open and close cycles. If not, re-align the photosystem by slightly bending the wall bracket until proper operation is obtained.

E.Tighten all mounting screws and bolts, loop and secure any extra wire.

AT THIS POINT PLUG DISCONNECT (REMOVE) THE POWER TO THE OPERATOR.

12

Image 12 Contents
Allstar LT Table of Contents Product Features Standard FeaturesOptional Features Component Identification Tools RequiredAssembly Instructions Page Installing the Operator Reinforce the Header WallSectional Doors and ONE-PIECE Doors With Track Mount Power Head to Ceiling Door Bracket InstallationInstall a Rough Service lamp bulb 75 Watt Connecting The Electrical PowerConnect the standard wall Push Button Provided to Terminals 1 & 0 on the Openers rearOptional Safe Finish Photosystem Installation Wire Connect the PhotosystemFinal Installation of Photosystem Units Mounting the Photosystem Wall Brackets Select a mountingAT this Point Plug Connect the Power to the Operator Alignment and Initial Test of Safe Finish PhotosystemConnecting Door Arm to Trolley Connecting the Door Arm to the DoorImportant Test Opener Obstruction Sensing Feature Photoelectric Obstruction TestTance is inadequate Try moving Adjustments Adjustment #1 Opening TravelAdjustment #2 Opening and Closing Force Adjustment #3 Obstruction Sensing at Close Limit PositionAdjustments / Important Safety Instructions Adjustment #3 Obstruction Sensing Closing DirectionAdjustment #4 Positive Mechanical Lock Adjustment Checking the Travel TimerOperating Instructions Operation of Your OpenerHOW to Operate the Door Manually Manual Release Disconnect Optional Three Function Wall StationSafe Finish Wiring Diagram / Door Edge Installation Optional Pneumatic Door Edge InstallationMaintenance Schedule / Installation Checklist Maintenance of Your OpenerInstallation Checklist Troubleshooting Guide Symptom Probable CAUSE/SOLUTIONParts Breakdown & Listing Manufacturer’s Limited Warranty Allstar Corporation Downingtown, PA