Allstar Products Group LT 50 owner manual Install a Rough Service lamp bulb 75 Watt

Page 10

C: INSTALLING THE OPERATOR

STEP 7: Install a Rough Service lamp bulb (75 Watt

 

maximum) firmly in the light socket. Light bulbs in Door Openers are

110051-3

 

subject to vibration during normal operation which may shorten their

 

life spans. Rough Service bulbs, available at most hardware stores,

 

are recommended.

 

 

STEP 8: Connect the standard wall Push Button

 

provided to Terminals 1 & 0 on the Opener's rear

108385

panel using a length of 2-conductor, minimum 22 gauge

 

wire. For mounting the standard Push Button, select a

convenient location near an access door. MOUNT AT

LEAST 5 FT FROM THE FLOOR TO DISCOURAGE UNAUTHORIZED OPERATION OF THE DOOR. Install the push button warning label (as shown below) supplied with the Opener near this installation.

If you are installing a Deluxe Wall Push Button), See Page 19 for the proper wiring procedure.

WARNING

UNAUTHORIZED OPERATION OF THE DOOR CONTROLS RISKS INJURY OR DEATH . DO NOT ALLOW ANYONE UNFAMILIAR WITH THE DOOR OPERATION TO OPERATE ANY DOOR CONTROLS. MOUNT THE PUSHBUTTON AT LEAST 5 FT FROM THE FLOOR.

This door is operated by a limited duty operator. To prevent the motor protector from tripping - Do not exceed 6 door cycles per hour.

STEP 9: Connecting The Electrical Power

Consult the label on the rear

 

panel of the Opener to determine its proper working voltage. Normally it will be

WARNING

marked for 115V, 60 cycle operation. (If it is a 230V model the label will clearly

 

 

indicate this.) The Opener

IMPROPER WIRING COULD

Permanent Wiring Connection

must

be

permanently

Use an appropriate

 

wired

with a

proper

CAUSE ELECTROCUTION

L1 & L2

ground

 

connection

OR DAMAGE TO CIRCUITRY.

conduit connector

according

to

all

 

Connections

FOLLOW LOCAL BUILDING

Ground Wire &

 

applicable

local,

state,

 

and federal

building and

AND ELECTRICAL CODES.

Chassis Connection

 

 

 

electrical codes.

Run a

 

 

 

three

(3)

conductor

 

 

 

(minimum

#14,

copper

 

 

 

conductors only) wire from a 15 AMP circuit breaker to the operator in a

 

 

suitable conduit. Use an appropriate connector to secure the conduit to the

 

110442

operator chassis as shown.

Connect the incoming line and neutral power

 

 

wires (L1 and L2) at the terminal block according to the diagram. Secure the

 

 

incoming earth ground to the chassis ground screw as shown .

 

 

NOTE: GFI protection is recommended especially on steel door applications.

10

104350

 

Image 10 Contents
Allstar LT Table of Contents Standard Features Product FeaturesOptional Features Component Identification Tools RequiredAssembly Instructions Page Installing the Operator Reinforce the Header WallSectional Doors and ONE-PIECE Doors With Track Mount Power Head to Ceiling Door Bracket InstallationConnect the standard wall Push Button Install a Rough Service lamp bulb 75 WattConnecting The Electrical Power Provided to Terminals 1 & 0 on the Openers rearFinal Installation of Photosystem Units Optional Safe Finish Photosystem InstallationWire Connect the Photosystem Mounting the Photosystem Wall Brackets Select a mountingAT this Point Plug Connect the Power to the Operator Alignment and Initial Test of Safe Finish PhotosystemConnecting Door Arm to Trolley Connecting the Door Arm to the DoorImportant Test Opener Obstruction Sensing Feature Photoelectric Obstruction TestTance is inadequate Try moving Adjustment #2 Opening and Closing Force AdjustmentsAdjustment #1 Opening Travel Adjustment #3 Obstruction Sensing at Close Limit PositionAdjustment #4 Positive Mechanical Lock Adjustment Adjustments / Important Safety InstructionsAdjustment #3 Obstruction Sensing Closing Direction Checking the Travel TimerOperating Instructions Operation of Your OpenerHOW to Operate the Door Manually Manual Release Disconnect Optional Three Function Wall StationSafe Finish Wiring Diagram / Door Edge Installation Optional Pneumatic Door Edge InstallationMaintenance of Your Opener Maintenance Schedule / Installation ChecklistInstallation Checklist Troubleshooting Guide Symptom Probable CAUSE/SOLUTIONParts Breakdown & Listing Manufacturer’s Limited Warranty Allstar Corporation Downingtown, PA