Hamilton Beach SA-HB-40-DB-CERT manual Start Up Rinsing Procedure con’t

Page 11

Start Up Rinsing Procedure (con’t)

5.After the ten-minute backwash cycle, manually advance the control valve to the brine refill position for ten minutes allowing water to flow into the brine storage tank. (See Figure 13.)

7. Plug in the control valve. (See Figure 15.)

Figure 13

Once water begins to flow into the tank fill the brine tank with a minimum of 100 lbs of salt pellets.

6.After the ten-minute refill time, manually advance the control valve to the service position. (See Figure 14.)

Figure 14

Figure 15

8.If it is necessary to extend the length of the transformer cord, an optional 15 foot (4.6-m) extension cord is available, (See Figure 16), or the cord may be spliced as follows:

a.Strip insulation from wire 5/16 inch (7.87 mm) from wire end.

b.Insert stripped wire into barrel of connector and crimp. For best results, crimp twice per wire as shown in Figure 17 .

Neither splice connections nor extension wire are supplied. They are available at hardware or electrical stores.

Figure 16

(AVP-1000907)

Figure 17

Hamilton Beach Owner’s Manual 11

Image 11
Contents Water Softener Model Table of Contents Introduction Equipment SpecificationsIntroduction / Equipment Specification System SpecificationsSizing Information Job Specification SheetJob Specification Sheet / Sizing Information Glossary of Terms Homeowner MaintenanceWater Conditioning / Homeowner Maintenance Water ConditioningBattery Backup Feature Homeowner Maintenance Calendar Day Override FeatureBrine Tank Cleaning Setting Time ClockManual Bypass Valve Optional Pre-Installation Check ListManual Bypass Valve / Pre-Installation Check List Injector Selection Detailed Installation InstructionsDetailed Installation Instructions Start-up Rinsing Procedure Start-Up Rinsing ProcedureStart Up Rinsing Procedure con’t Programming the Control Valve Battery Backup FeatureBattery Backup/ Programming the Control Valve Programming Guide Setting Description 40DB 48DBLevel I Programming Level I Programming ParametersWater Hardness Programming Guide Changing the SettingsTime of Day Time of RegenerationLevel II Programming Parameters Level II ProgrammingName Description Level I and II Default SettingsLevel I Parameters Level II ParametersLbs of Salt Salt Settings and Capacity KgrSystem Capacity Inputs System Capacity InputsFlow Diagrams Flow DiagramsFlow Diagrams Control Valve Diagram Control Valve DiagramCode Part Number Description Qty Control Valve PartsSystems Diagram Systems Diagram Systems PartsHamilton Beach Error Detection Codes TroubleshootingTroubleshooting ErrorsProblem Description Possible Cause Solution Troubleshooting Troubleshooting ProceduresTroubleshooting Troubleshooting Page Page Page Page