FULL SIZE GAS CONVECTION OVENS - REMOVAL AND REPLACEMENT OF PARTS
3.Reverse the procedure to install the assembly and check for proper operation.
NOTE: Check to ensure the spark gap distance is approximately 1/8". If the gap appears to be excessive or poor sparking is occurring then adjust.
3. Remove screws securing baffle panel and remove the panel.
BLOWER AND MOTOR
WARNING: DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES.
WARNING: SHUT OFF THE GAS BEFORE SERVICING THE UNIT.
1.Take out the racks and rack supports.
2.Remove screws securing the SNORKEL and remove the snorkel.
4.If replacing:
A.Blower Only - Loosen set screws on blower hub and using a bearing puller, remove blower from motor shaft.
1)Reverse procedure to install and adjust blower position as outlined under BLOWER ADJUSTMENT in SERVICE PROCEDURES AND ADJUSTMENTS.
B.Motor - perform step 4A and continue procedure.
5.Remove the screws securing the air baffle to the rear wall at the lower right hand corner.
Page 11 of 64 |
| F32700 (February 2006) |
|