II. Installing the E-Z Port Hub
The location of the
terminated and routed to this location. Once this is done,
installation of the
Plug each of the keypad cables into one of fifteen available jacks on the back of the
Once all the
Cat-5 cables from keypads.
III. Connecting the E6M to the E-Z Port
Once you have installed the
Both RJ45 connectors are wired identically with the 568A wiring scheme, so either end is connected to the
Fig. 3: Network Input
AUDIO OUTPUT | IR EMITTER OUTPUTS |
| NETWORK | |
| ||||
CONNECT TO | +12V OUTPUT PULSE | CONNECT TO | ||
ODD NUMBERED OUTPUTS ARE IDENTICAL (TIED TOGETHER) |
| |||
|
|
|
| |
| EVEN NUMBERED OUTPUTS ARE IDENTICAL (TIED TOGETHER) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 2 3 4 5 6 SUM
DIGITAL OUTPUT
CONNECT TO
the E6M.
If the supplied network cable is too short or too long, you can make your own using the 568A wiring scheme outlined in Fig. 1, page 6.