Bosch Appliances SHY660, SHE990, SHE660, SHV570, SHX570 installation instructions Plumbing PREPARATmON

Page 7

i355mm) Hot Water

Supply

Line

Figure 6

Plumbing Preparation

PLUMBING PREPARATmON

Scald Hazard

To avoid being scaJded, do not perform any work on a charged hot water tine. Serious injury could result. Only qualified plumbers should perform pJumbing work. Do not attempt any work on the dishwasher hot water supply pJumbing until you are certain the hot water supply is shut off.

Temperatures required for so(dedng and sweating wil( damage the dishwasher's base and water inJet va(ve. If plumbing lines are to be eo)dered or sweated, keep the heat source at Jeast 6 inches (152.4 ram) away from the dishwasher's base and water in(et vaJve.

Hot Water Supply

The hot water heater should be set to deliver approximately 120° F (49 ° C) water to the dishwasher, Water that is too hot can cause some detergents to lose effectiveness, Lower water temperatures will increase run times, The hot water supply pressure must be between 15 - 145 psi (1 - 10 bars),

Hot Water Supply Plumbing

Install an easily accessible shut-off valve (not supplied) in the hot water supply line, as shown in Figure 6, All solder connections must be made before the water line is connected to the dishwasher's water inlet valve, Water may abe be supplied to the dishwasher by using a stainless steel braided hose approved for dishwasher use, Check with your local plumbing supply sources for the proper hose and 90° elbow fitting,

NOTE: Regardless of where the hot water supply line enters the enclosure, position the line 14" (355mm) from the enclosure's left side, as shown in Figure 6,

NOTE: Decide whether braided hose or copper tubing wiii be used for the hot water supply plumbing, and purchase the correct type of hot water supply shut-off valve, 90° elbow, and necessary fittings for the hot water supply

6

Image 7
Contents Dishwasher Installation instructions Important Safety instructions Tools Needed Toe Panel Installation Kit Installation KitEncBosure Preparation Enclosure PREPARATmONMax Plumbing PREPARATmON Dishwasher PREPARATmON Installing an Air GapDmSHWASHER PREPARATmON Door Panel mNSTALLATmON Electrical Supply Cable Position Channels PLACmNG the DishwasherMnstaHation of the Rubber Drain Hose Adaptor Connecting the Drain Hose to Household PumbingLegY Leveler Locking HOT Water CONNECTmON Grounding instructions ELECTFiICAL CONNECTmONElectrical CONNECTmON Regutar Toe Panel installationTOE Panel mNSTALLATmON Final mNSTRUCTmONS Base and TOE PanelCustomer SERVmCE Page Page