Operation
Installation 3
Section 3
Operation
3.1 Installation
Installation consists of mounting the equipment, making the required electrical connections, and entering the desired set points.
CAUTION
Remove all power prior to installing the
Preamplifier.
Preamplifier Mounting
The preamplifier is a
CAUTION
Remove all power prior to connecting field wiring.
Electrical Interface
Electrical connections at the preamplifier include connecting the detector high voltage and signal coaxial cables and the field cable from the associated controller.
The detector high voltage and signal cables enter the preamplifier through “Seal Grip” type penetrations on the enclosure body. The “Seal Grips” contain a rubber gland that is intended to grip the coaxial cables to prevent moisture entry into the enclosure. The “Seal Grips” are an integral part of the detector cables. The “Seal Grip” enclosure nut is removed from the fitting. The insulating washer stay with the fitting. The detector signal and high voltage cables, with connectors and “Seal Grip” fitting nuts are then inserted into the holes preamplifier enclosure. The “Seal Grip: end fittings are then
The detector Signal (BNC) and High Voltage (SHV) cables are then terminated on the bulkhead connectors located on the enclosure inner panel.
On the
On the
A desiccant bag is provided in the enclosure to absorb moisture. The desiccant bags should be checked for moisture absorption prior to placing into service. Each bag contains a color indicator stripe that turns red when it should be replaced.