Maintenance, Calibration and Troubleshooting
Maintenance 4
Section 4
Maintenance, Calibration and Troubleshooting
4.1 Maintenance
The
Whenever the preamplifier enclosure is opened, the condition of the internal desiccant package should be checked. The desiccant bag is provided in the enclosure to absorb moisture. The desiccant bags should be checked for moisture absorption prior to placing into service, or whenever the electronics enclosure cover is opened. Each bag contains a color indicator stripe that turns red when it should be replaced.
4.2 Electronic Calibration
Electronic Adjustments
There are no user adjustments available on the
Table
Table 4-1. Electronic Adjustments
Potentiometer | Adjustment | Tolerance |
R11 | Programmable Gain Amplifier Offset Adjustment | ± 2 mV |
R12 | Auto Zero | ± 10 mV |
NOTE
Refer to the drawings in Appendix B to locate adjustment and/or test points, if required.
The follow factory calibration and test procedures are listed for reference only.
Document | Description |
Test Procedure, Victoreen Loop Communications | |
Test Procedure, RS232 communications | |
Electrometer PCB Test Procedure |