Bunn LCR-3 service manual Drip Tray Installation

Page 7

DRIP TRAY INSTALLATION

1.Unscrew the middle and right front legs (Fig. 1) - just enough to allow the mounting bracket to slide under the legs, (~1/8”).

Caution: The LCR-3 HV is very heavy. Use wood blocks to hold the machine up while working underneath it!

2.Insert the bracket between the legs and the base of the machine and retighten the legs, (Fig. 2).

Fig. 1

Fig. 2

3.Insert the Drip Tray onto the mounting bracket, (Fig. 3). Make sure the drain fitting is still protruding through the hole.

Fig. 3

Optional Drip Tray Drain

A separate drain tube (not supplied) may be attached to fitting in the bottom of the tray, if desired. Note: Drill a ¼” hole in the center of the fitting, before attaching the drain hose. Direct the other end of this hose into a permanent drain.

Alternate Evaporator Drain

For locations where the Drip Tray is not desired, connect a separate drain hose (not supplied) to the Evaporator Drain Fitting and direct the other end of this hose into a permanent drain.

CAUTION: FAILURE TO INSTALL THE DRIP TRAY OR ALTERNATE EVAPORATOR DRAIN WILL RESULT IN WATER DRIPPING ON TO THE COUNTER AND/OR FLOOR UNDER THE DISPENSER.

INSTALLING THE PUMP TUBING

(Refer to the Tubing Installation Instructions in side the cabinet door for details.)

1.Loosen the thumbscrew securing the tubing retainer plate to the pump housing. Set the retainer plate aside.

2.Depress the tension screw and remove it from the notch in the pump body, releasing the pump compression band.

3.Apply lubricant (BUNN-O-MATIC part number M2531.0001) to the new pump tubing.

4.Insert the tubing onto the mix chamber port and wrap the tubing around the pump rotor, making sure that the elbow and clamps end up on the bottom side of the pump body.

5.Close the compression band reinsert the tension screw into the notch in the pump housing.

6.Replace the tubing retainer plate and tighten the thumbscrew.

7.Reconnect bag connector to the product box.

8.Repeat steps 1 through 7 for the other two pumps.

9.Prime the pumps. Refer to Priming the Concentrate Lines section.

Thumbscrew

 

 

 

 

 

 

 

 

 

 

 

 

 

Tension

 

 

 

 

2.0”

 

 

 

 

 

2.0”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

Lubricate between arrows

 

 

Remove Retaining Plate Release Spring Tension

Remove Tubing

 

 

Lubricate New Tube

Tension Screw

 

Tube Clamp

 

Install New Tubing

Completed Installation

7

41129 110608

 

Image 7
Contents Phone 217 529-6601 FAX 217 LCR-3 HVBUNN-O-MATIC Commercial Product Warranty Introduction ContentsMoving Parts User NoticesPlumbing Requirements Electrical Requirements Field Wiring Terminal Block DiagramLeveling the Dispenser Initial SET-UPElectrical HOOK-UP Plumbing HOOK-UPDrip Tray Installation Operating Controls and Interface Initial Fill & Heat Rinse Procedure Rinse Alarm FeatureAlarm Level Alarm Mode Optional 2- Product Operation BIB Empty Lockout FeatureBrew Temperature Lockout Feature Energy Saver ModeProgramming the Dispenser Programming HRS + BibEMPTY LockoutSaver Tank Temp No Exit Action CAL Middle Pump ? CAL MID Pump VOL LCD Display Actiondescription CAL Left Pump ? LeftCAL HI WTR VOL Test Refill ? Exit YES Test Heater ? WTR Start DelayWTR Stop Delay LCD Display XxoverflowPriming the Concentrate Lines Loading the ConcentrateTo Dispense Hot Water Operating the DispenserFilling Cambros or Other Large Containers Weekly Refrigeration AIR Filter Cleaning & Preventative MaintenancePreventive Maintenance Weekly SanitizingReplacing the Pump Tubing Draining the HOT Water Tank Possible Cause Troubleshooting Procedures TroubleshootingNo Display Check for BAD Connections TOO LOWHeating WaterScreen Displayed Possible Cause Dispenser Flow Rate Calibration Calibrating the Left Concentrate PumpField Calibrating the Empty BIB Warning Schematic Wiring Diagram