Bunn S/N DUAL068000 manual Initial Setup, Coffee Brewing, Cleaning

Page 8

INITIAL SETUP

CAUTION: The brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions.

1.Insert an empty funnel into the funnel rails of one of the brew stations.

2.Place an empty server under the funnel.

3.Connect the brewer to the power source. Water will begin flowing into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT...TANK FILLING until tank is filled with water.

4.Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Display will show READY TO BREW...WATER TEMP: XXX˚ when tank is at operating temperature.

5.Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refill- ing.

6.Water volumes have been preset at the factory. Refer to adjustments for the Set Brew Volumes section of this manual should the volume need to be increased or decreased.

7.The brewer is now ready for use in accordance with the coffee brewing instructions.

COFFEE BREWING

1.Insert a BUNN filter into the Smart Funnel.

2.If a grinder is not used to obtain the coffee grounds, pour the proper amount of fresh coffee grounds into the funnel and level by gently shaking. Slide the funnel into the funnel rails and select batch size. Proceed to step 5.

3.If a G9-2T DBC or MHG grinder is used with a compatible Smart Funnel, select the desired batch size on the grinder. Grind the selected amount of fresh coffee into funnel and level grounds by gently shaking. It is not necessary to select a size on the brewer.

4.Slide the funnel into the funnel rails. The brewer will read the size ground through the chip in the funnel handle and will automatically select the correct size to brew.

5.Place an empty server under the funnel.

6.The ENABLE BREW switch must be ON. Momentarily press and release the "BREW" switch. If the brewer has the funnel lock option and if it is activated, once a brew cycle has been started the funnel is locked in place. There may be certain situations in which the brew cycle will not begin when the brew switch is pressed:

a)BREW TEMPERATURE TOO LOW - wait until heated or cancel BREW LOCKOUT option.

b)FUNNEL NOT IN PLACE (or using a standard brew funnel) - cancel FUNNEL DETECT option.

c)CHECK FUNNEL - remove funnel, empty previously brewed grounds and grind a new batch into funnel.

d)SERVER NOT IN PLACE - place Soft Heat Server, or cancel SERVER DETECT option.

7.If none of the above messages are displayed, the display will read NOW BREWING and the time remaining in the brew cycle. Arrows will point to the side which is brewing. If both sides are brewing simultaneously, the arrows will alternate from left to right on the display.

8.Following the BREW will be a countdown of DRIPPING time which shows the time remaining until the funnel lock will release. Discard the grounds and filter only after visible dripping stops.

CLEANING

1.The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment.

2.Check and clean the sprayhead. Use the pointed end of sprayhead cleaning tool (#38227.0000) to remove any mineral deposits from the sprayhead holes.

3.Insert the long end of sprayhead cleaning tool into the sprayhead fitting, and rotate several times to remove any mineral deposits from the fitting.

4.Insert the short end of sprayhead cleaning tool into the bypass fitting, and rotate several times to remove any mineral deposits from the fitting.

NOTE: In hard water areas, this may need to be done daily. It will help prevent liming problems in the brewer and takes less than a minute.

Page 8

29877-3 062005

 

Image 8
Contents Dual SH DBC Phone 217 529-6601 FAX 217BUNN-O-MATIC Commercial Product Warranty IntroductionTable of Contents User Notices 00658.000000831.0000 00656.0000 37881.0000 03408.0004Electrical Requirements 230 volt ac modelsPlumbing HOOK-UP CE RequirementsPlumbing Requirements Operating Controls Coffee Brewing Initial SetupCleaning Glossary Programming Switches ProgrammingProgram Functions Level Programming the BrewerImportant Programming Notes Read Carefully Using a Smart Funnel and a G9-2T DBC or MHG Grinder Not using a Smart Funnel and/or a G9-2T DBC or MHG GrinderRecipe Programing Methods RecipesLevel Continue To E To DReturns To aContinue to F Program Flow DiagramContinue to B Return to a Left Brew Valve Byps OZ/M Units Setting Units of Measure Procedure for modifying units of measureThis function allows the operator to set Brew Procedure for Setting the RecipeSET NEW Recipe SET NEW Recipe Sizes DONE?Procedure to program the coffee name SET NEW RecipesOtherwise, press Next to display no Name RightReview RECIPES/MODIFY RECIPES/SET UP no Name Coffee Procedure for reviewing recipesTimes Review RecipesBrew OZ Setting or Adjusting Brew VOL- Umes Done Coffee Name Modifyshownext Batches DONE? YESBypass Batches DONE?SET Pulse Brew Modifying pulse brewNO-NAME Left Modifyshownext SET Pulse BrewSET Pulse Brew Easy Pulse Setup DONE? SET Pulse Brew Enter TimesTIMES? SET Preinfusion Procedure to modify drip times Setup CompleteDrip Time now displayed on non funnel lock units as well Read % BypassProcedure to copy settings Reads Copy SettingsAssign Recipes OnlyEnable ADS? YOU SURE?Are YOU SURE? SET TempProcedure to set ready temperature SET TempRefill Range 20 to SET ReadySpray OZ/M Procedure to adjust the flow rate setting Procedures to calibrate the sprayhead flow rateBypass OZ/M Calibrate FlowRepeat steps 1 8 when calibrating the other side Procedures to calibrate the bypass flow rateRepeat steps 1 9 when calibrating the other side Calibrate FlowNot resettable Procedures to view/reset the brew countersBrew Counters This function allows the operator to trackServer not in Place Funnel DetectServer Detect Service Tools Testing individual components outputsService Tools Procedure to test components outputs Procedure to test switchesLeft Brew Valve Nothing PressedService Tools Procedures to test serversProcedures to test coil frequency ERS?Factory Defaults Procedure to set factory defaultsScreen Displayed Possible Cause TroubleshootingDisable the Server Detect func- tion Temperature Troubleshooting ProceduresScreen Displayed Smart Funnel not fully inserted into the funnel railsControl Board/Thermistor failure Tank Heater failureTriac Failure Troubleshooting Problem Possible Cause Troubleshooting Procedure Equipment will not operate No power or incorrect voltageData plate within +/- 10% Brew cycle will not start No waterProblem Possible Cause Tank Heaters Power Possible CauseLimit Thermostat Problem TriacProblem Possible Cause Troubleshooting Procedures Consistently high or low beverage Brew Volume adjustment Water temperatureLevel in server For each brew cycleTank Heaters Remove and clean lime off tank Weak beverage Incorrect RecipeAge, preinfusion, or pulse brew TionsSchematic Wiring Diagram Dual SH with Smart Funnel DBCSchematic Wiring Diagram Dual SH DBC W/SMART Funnel Limit Thermostat MT1

S/N DUAL068000 specifications

The Bunn S/N DUAL068000 is a versatile and high-performance commercial coffee brewer designed for those who demand quality and efficiency in their coffee-making operations. This brewer is part of Bunn’s DUAL series, known for its innovative technology and robust construction, making it a favored choice among coffee shops, restaurants, and offices.

One of the standout features of the DUAL068000 is its dual brewing capability. This allows users to brew two different types of coffee simultaneously, ensuring a wide range of flavors and options for customers. The unit is equipped with two independent brewing chambers, each capable of producing a batch of coffee in a matter of minutes, which is ideal for high-volume settings.

The DUAL068000 utilizes Bunn’s state-of-the-art brewing technology, including its patented "Duo-Temp" brewing system. This technology ensures that water is heated to the optimal temperature, generally between 195°F and 205°F, for extracting the best flavors from coffee grounds. Furthermore, the unit features a precision digital control system with programmable settings, allowing users to fine-tune brew times and temperatures for consistent quality.

An innovative characteristic of the DUAL068000 is its energy efficiency. The brewer incorporates an energy-saving mode, reducing power consumption during off-peak hours without sacrificing performance when needed. This makes the brewer not only cost-effective but also environmentally friendly, aligning with the growing trend towards sustainability in the food and beverage industry.

In terms of construction, the Bunn S/N DUAL068000 boasts a durable stainless steel design, ensuring longevity and resistance to wear and tear. It is also designed with easy access to components for maintenance, making it convenient for operators to clean and service the machine as necessary.

Other notable features include an integrated hot water faucet for tea and instant beverages, the capability to brew into various container sizes, and a large reservoir that minimizes refill frequency.

In conclusion, the Bunn S/N DUAL068000 is an exemplary commercial coffee brewer that combines advanced technology, durable construction, and user-friendly features. Its dual brewing capability and energy-saving design make it a top choice for establishments looking to enhance their coffee offerings while maintaining efficiency and quality. With this brewer, businesses can cater to a diverse array of customer preferences, making it an invaluable asset in any beverage service environment.