Electrical feeder cable connection
The operations must be executed by a qualified technician.
To connect the supply cable:
-Remove the screws securing the cover “A” on the rear of the cooker (fig. 60).
-Feed the supply cable through the cable clamp “D”. The supply cable must be of a suitable size for the current requirements of the appliance; see the section “Feeder cable section”.
-Connect the wires to the terminal block “B” as shown in the diagram in figure 61; or connect the phase wires to the terminal block “B” and the earth wire to the terminal PE as shown in figure 60.
-Take up any slack in the cable and secure with the cable clamp “D”.
-Replace the cover “A”.
Before effecting any intervention on the electrical parts of the appliance, the connection to the network must be interrupted.
Feeder cable section type H05RRF
230 V 3 x 0,75 mm2
Earth cable must be 2 cm longer than neutral and live cables.
PE
230 V
N
B
L D
L1 N PE (L2)
Fig. 61
A
Fig. 60
47