Lennox International Inc GWB9-075IH-2, GWB9-100IH-2, GWB9-050IH-2 State Code Definitions

Page 40

S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS

Table 9 - State Code Definitions

40

Image 40
Contents Installation Instructions Boiler Dimensions Introduction IntroductionImportant Safety Information GeneralSEA Level Ratings Natural and Propane Gases Net Ahri Rating Shipping Flue DiameterBoilers for USE AT High Altitude United States Installations 90 50/75/100 Series 2 Natural GAS90 50/75 Series 2 Propane GAS 43331093 43331096Boiler Sizing Before Installing the BoilerBoiler Location Considerations Boiler Installation Locating The BoilerCombustion Air And Vent Pipe Requirements Extreme cold climate areas, use ¾ Armaflex or equivalentInstall boiler on level surface Boiler is not to be installed on carpetingCondensate Drain Requirements Foundation RequirementsNear Boiler Piping Clean the System FirstSupply And Return Lines Single Zone Boiler Piping Multi-Zone Systems Two Zone Boiler Piping With Zone ValvesTwo Zone Boiler Piping With Circulators Page Page Page Expansion Tank And Make-Up Water Safety Relief ValveTerminate pipe with plain end not threaded Diaphragm Type Expansion Tank Piping Conventional Closed Type Expansion Tank Piping Reinstall vent drain line Condensate Drain PipingFilling Condensate Trap With Water Chilled Water PipingCombustion AIR and Vent Pipe Connections And TerminationExample Elbow @ 3 ft. + 1 elbow @ 3 ft. = 6 equivalent ft. of pipeInstallation Boiler SizeVent AIR Intake Roof Vent / Intake TerminationsLess Than 12 Clearance Concentric Vent Terminations CombustionVent AirCombustion Air and Vent Piping Boiler Connections Feet minimum total equivalent length for all modelsConnecting The Gas Piping GAS Supply PipingCheck Gas Supply Leak Check Gas PipingGas Pipe Sizes 625,000445,000 365,000Electrical Wiring Electric Power SupplyThermostat Installation Connect Circulator Pump WiringWiring Schematic Ladder Wiring Diagram Page Ladder Diagram for Figure Controls and Accessories Casting Temperature Safety Switch Drain ValveDraft Inducer Circulator Pump Start UP Operating Instructions To Turn Off Gas To ApplianceUser Parameters Adjusting Settings S9381A Integrated Boiler Control Operation and AdjustmentsDisplay State Code Definitions Sequence of Operation Check OUT Procedure and Adjustment Set Thermostat To Desired Room Temperature Review All InstructionsVR8205 Maintenance and Cleaning Igniter wires Gas valve wires Annual Examination And Cleaning Of Boiler ComponentsRemove draft inducer and gasket from top of flue connector Troubleshooting Initial Service ChecksError Codes Differential AIR Pressure Switch Check Boiler Differential PressureAluminum Series Fill Water and Chemistry Clean System FirstEliminate System Leaks General Guidelines When Using Antifreeze Antifreeze Products Installation and CHECK-OUT Certificate Boiler Model Serial # Date Installed Measured BTU/HR inputPage Lennox Industries Inc. Dallas, Texas
Related manuals
Manual 32 pages 41.03 Kb