Lennox International Inc GWB9-050IH-2, GWB9-075IH-2 Electrical Wiring, Electric Power Supply

Page 30

ELECTRICAL WIRING

!WARNING

Electrical shock hazard. Turn OFF electrical power supply at service panel before making electrical connections. Failure to do so could result in death or serious injury.

Electrically bond boiler to ground in accordance with requirements of authority having jurisdiction. Refer to:

USA- National Electrical Code, ANSI/NFPA 70.

Canada - Canadian Electrical Code, Part I, CSA C22.1: Safety Standard for Electrical Installations.

Electric Power Supply

Prior to making any line Voltage connections, turn OFf electrical power at fuse box.

1.Run separate 115 Volt circuit from separate over current protection device in electrical service entrance panel. This should be 15 ampere circuit.

2.See Figure 20, Page 31 for diagram showing service switch junction box and power supply connection points.

3.Locate service switch in vicinity of boiler. Verify it is turned OFF during service or maintenance.

Connect black (hot) lead from power supply to black wire labeled L 120 VAC.

Connect white (neutral) lead from power supply to white wire labeled N 120 VAC.

Connect green (ground) lead from power supply to green wire labeled G 120 VAC.

4.Run 14 gauge or heavier copper wire from boiler to grounded connection in service panel or properly driven and electrically grounded ground rod.

Thermostat Installation

Thermostat location has important effect on operation of boiler system.

Follow instructions included with your thermostat.

Locate thermostat about five feet above floor on inside wall.

Mount directly on wall or on vertical mounted outlet box.

It should be sensing average room temperature.

Set heat anticipator (where applicable) at 0.7 amps. Connect 24 Volt thermostat leads to two(2) yellow wires located in junction box, located on outer jacket of boiler.

See Figure 20, Page 31 for junction box and thermostat field wiring connections.

Connect Circulator Pump Wiring

See Figure 20, Page 31 for circulator pump field wiring con- nections.

Supplied 5 foot wiring harness with flexible metal conduit for connection from circulator pump to junction box.

If two 120 Volt circulator wire terminals inside junction box are not used, leave two wire nuts to prevent short circuit.

NOTICE

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

Things to Avoid when Locating Thermostats

DEAD SPOTS:

Corners and alcoves

Behind doors

COLD SPOTS:

HOT SPOTS:

Concealed pipes or ducts

Concealed pipes

Fireplace

 

Stairwells - drafts

TV sets

Radios

 

Unheated rooms on

Lamps

Direct sunlight

other side of wall

Kitchens

 

30

Image 30
Contents Installation Instructions Boiler Dimensions Introduction IntroductionImportant Safety Information GeneralSEA Level Ratings Natural and Propane Gases Net Ahri Rating Shipping Flue DiameterBoilers for USE AT High Altitude United States Installations 90 50/75/100 Series 2 Natural GAS90 50/75 Series 2 Propane GAS 43331093 43331096Before Installing the Boiler Boiler SizingBoiler Location Considerations Combustion Air And Vent Pipe Requirements Boiler InstallationLocating The Boiler Extreme cold climate areas, use ¾ Armaflex or equivalentCondensate Drain Requirements Install boiler on level surfaceBoiler is not to be installed on carpeting Foundation RequirementsClean the System First Near Boiler PipingSupply And Return Lines Single Zone Boiler Piping Multi-Zone Systems Two Zone Boiler Piping With Zone ValvesTwo Zone Boiler Piping With Circulators Page Page Page Safety Relief Valve Expansion Tank And Make-Up WaterTerminate pipe with plain end not threaded Diaphragm Type Expansion Tank Piping Conventional Closed Type Expansion Tank Piping Filling Condensate Trap With Water Reinstall vent drain lineCondensate Drain Piping Chilled Water PipingExample Combustion AIR and Vent PipeConnections And Termination Elbow @ 3 ft. + 1 elbow @ 3 ft. = 6 equivalent ft. of pipeInstallation Boiler SizeVent AIR Intake Roof Vent / Intake TerminationsLess Than 12 Clearance Concentric Vent Terminations CombustionVent AirCombustion Air and Vent Piping Boiler Connections Feet minimum total equivalent length for all modelsCheck Gas Supply Connecting The Gas PipingGAS Supply Piping Leak Check Gas Piping445,000 Gas Pipe Sizes625,000 365,000Thermostat Installation Electrical WiringElectric Power Supply Connect Circulator Pump WiringWiring Schematic Ladder Wiring Diagram Page Ladder Diagram for Figure Controls and Accessories Draft Inducer Casting Temperature Safety SwitchDrain Valve Circulator PumpStart UP Operating Instructions To Turn Off Gas To ApplianceS9381A Integrated Boiler Control Operation and Adjustments User Parameters Adjusting SettingsDisplay State Code Definitions Sequence of Operation Check OUT Procedure and Adjustment Set Thermostat To Desired Room Temperature Review All InstructionsVR8205 Maintenance and Cleaning Annual Examination And Cleaning Of Boiler Components Igniter wires Gas valve wiresRemove draft inducer and gasket from top of flue connector Troubleshooting Initial Service ChecksError Codes Differential AIR Pressure Switch Check Boiler Differential PressureAluminum Series Clean System First Fill Water and ChemistryEliminate System Leaks General Guidelines When Using Antifreeze Antifreeze Products Installation and CHECK-OUT Certificate Boiler Model Serial # Date Installed Measured BTU/HR inputPage Lennox Industries Inc. Dallas, Texas
Related manuals
Manual 32 pages 41.03 Kb

GWB9-050IH-2, GWB9-100IH-2, GWB9-075IH-2, Gas-Fired Hot Water Boiler specifications

Lennox International Inc. is a prominent player in the HVAC industry, renowned for its innovative solutions and high-efficiency products. Among its standout offerings is the GWB8 Gas-Fired Hot Water Boiler, available in various models including GWB8-262E-2, GWB8-245E-2, GWB8-280E-2, and GWB8-299E-2. These units are designed to provide reliable and efficient heating solutions for residential applications.

One of the key features of the GWB8 series is its energy-efficient operation. These boilers are designed to achieve an AFUE (Annual Fuel Utilization Efficiency) rating of up to 84%, allowing homeowners to save on energy costs while reducing their environmental footprint. The product utilizes a cast-iron heat exchanger, which promotes optimal heat retention and distribution, ensuring consistent performance throughout the heating season.

The GWB8 series incorporates advanced technologies to enhance comfort and efficiency. A significant innovation is the use of a power venter system that facilitates venting through the sidewall of the home, providing installation flexibility while maintaining safety standards. Additionally, the boilers are equipped with a Honeywell integrated control for precise temperature management and modulating gas valve technology, which adjusts the gas flow to match the heating demand, further optimizing fuel consumption.

Another defining characteristic of the GWB8 models is their durable construction. Designed to withstand the rigors of heating applications, these models feature a robust, powder-painted steel cabinet that helps prevent rusting and corrosion. The access doors are insulated, contributing to overall efficiency while allowing easy maintenance and serviceability.

The GWB8 series is also designed with homeowner comfort in mind. The quiet operation of these boilers ensures that they blend into the living environment without disruptive noise, making them an ideal choice for residential settings. The models are compatible with various heating systems, including hydronic heating, making them versatile and reliable.

Overall, Lennox's GWB8 Gas-Fired Hot Water Boiler series is an excellent choice for homeowners seeking efficient, durable, and reliable heating solutions. With a combination of advanced technologies, energy-efficient performance, and practical features, these boilers set a high standard for residential heating systems in today's market.