Lennox International Inc GWB9-050IH-2, GWB9-075IH-2 Check OUT Procedure and Adjustment

Page 42

CHECK OUT PROCEDURE AND ADJUSTMENT

Verify Proper Sequence Of Operation

Place boiler into operation and observe operation through several cycles. Follow remaining steps in this section to insure boiler is operating correctly.

First couple of cold starts may be rough due to gas line not being completely purged of air, causing low firing rate and high excess air levels.

Inspect Venting And Air Intake System

Operate boiler and verify all vent/air intake connections are gas-tight and watertight. Repair any leaks immediately.

Inspect Condensate Drain

Verify all connections are watertight, and that condensate flows freely. Repair any leaks immediately.

Test Other Safety Controls

If boiler is equipped with low water cut off, manual reset high limit, or additional safety controls, test for operation as outlined by control manufacturer. Burner should be operating and should go off when controls are tested. When safety controls are restored, burner should reignite.

Set Thermostat Heat Anticipator (If Used) And Verify Thermostat Operation

For single thermostat connected to yellow thermostat lead wires in furnished field wiring junction box, heat anticipator should be set at 0.7 amps. For other wiring configurations, refer to instructions provided by thermostat manufacturer regarding adjustment of heat anticipator. Cycle boiler with thermostat. Raise thermostat to highest setting and verify boiler goes through normal start up cycle. Lower thermostat to lowest setting and verify boiler goes off.

Inspect System Piping

Verify all connections are watertight. Repair any leaks immediately.

Test Ignition System Safety Shutoff Device

1.Turn off manual gas valve

2.Set thermostat to call for heat

3.Boiler begins normal sequence of operation

4.After approximately 20 seconds (pre purge, state code 4) gas valve is powered (state code 6).

5.After 13 second trial for ignition, gas valve closes, (state code 10)as integrated boiler control senses that flame is not present.

6.After about 30 seconds, control will go back to step 4 and make two more attempts to light the burner, then go into soft lockout and display Error code 62.

7.To restart system, open manual gas valve that was closed in Step 1. Reset lockout by breaking and restoring power to boiler. Observe normal operation.

Test High Limit Control And Adjust

While burner is operating,adjust high limit setpoint below actual boiler water temperature. Burner should go off while circulator continues to operate. Raise limit setting above boiler water temperature and burner should reignite after inter-purge (retry delay). Set high limit control to design temperature requirements of system. Maximum high limit setting is 190°F. Minimum high limit setting is 80°F.

Measure Natural Gas Input Rate

Correct input rate is essential for proper and efficient operation of the burner and boiler.

1.Determine elevation at installation site.

2.Table 1 and Table 2, Page 6 to determine correct input rate for the local elevation.

3.Obtain yearly average heating value of local gas supply from gas utility. At sea level elevation, it should be approximately 1000 Btu’s per standard cubic foot.

4.Operate boiler for 5 minutes.

5.Turn off all other gas appliances, extinguishing standing pilots where applicable.

6.At gas meter, measure time in seconds required to use one cubic foot of gas.

7.Calculate input rate according to the following formula: 3600 x heating value from step 3

Btuh in put rate = time from step 6

8.Measured input rate should be within +/-2% of input rating from step 2. If within 2%, go to step 9. If not, adjustment is required, proceed as follows:

A.Turn boiler off

B.Set up U-tube manometer or differential pressure gauge for measuring manifold pressure. See Figure 27, Page 44.

C.Manometer or gauge must be able to read at least 0.0 to 3.0 inches water column of pressure, and resolve to at least 0.1 inches water column.

D.Turn boiler on.

E.Manifold pressure has been nominally set at 2.5 inches w.c. Manifold pressure and input rate must always be measured with pressure regulator cover screw installed. Cover screw must be removed for adjustment. Manifold pressure reading will change (increase) when cover screw is removed.

42

Image 42
Contents Installation Instructions Boiler Dimensions Introduction IntroductionImportant Safety Information GeneralSEA Level Ratings Natural and Propane Gases Net Ahri Rating Shipping Flue DiameterBoilers for USE AT High Altitude United States Installations 90 50/75/100 Series 2 Natural GAS90 50/75 Series 2 Propane GAS 43331093 43331096Before Installing the Boiler Boiler SizingBoiler Location Considerations Combustion Air And Vent Pipe Requirements Boiler InstallationLocating The Boiler Extreme cold climate areas, use ¾ Armaflex or equivalentCondensate Drain Requirements Install boiler on level surfaceBoiler is not to be installed on carpeting Foundation RequirementsClean the System First Near Boiler PipingSupply And Return Lines Single Zone Boiler Piping Multi-Zone Systems Two Zone Boiler Piping With Zone ValvesTwo Zone Boiler Piping With Circulators Page Page Page Safety Relief Valve Expansion Tank And Make-Up WaterTerminate pipe with plain end not threaded Diaphragm Type Expansion Tank Piping Conventional Closed Type Expansion Tank Piping Filling Condensate Trap With Water Reinstall vent drain lineCondensate Drain Piping Chilled Water PipingExample Combustion AIR and Vent PipeConnections And Termination Elbow @ 3 ft. + 1 elbow @ 3 ft. = 6 equivalent ft. of pipeInstallation Boiler SizeVent AIR Intake Roof Vent / Intake TerminationsLess Than 12 Clearance Concentric Vent Terminations CombustionVent AirCombustion Air and Vent Piping Boiler Connections Feet minimum total equivalent length for all modelsCheck Gas Supply Connecting The Gas PipingGAS Supply Piping Leak Check Gas Piping445,000 Gas Pipe Sizes625,000 365,000Thermostat Installation Electrical WiringElectric Power Supply Connect Circulator Pump WiringWiring Schematic Ladder Wiring Diagram Page Ladder Diagram for Figure Controls and Accessories Draft Inducer Casting Temperature Safety SwitchDrain Valve Circulator PumpStart UP Operating Instructions To Turn Off Gas To ApplianceS9381A Integrated Boiler Control Operation and Adjustments User Parameters Adjusting SettingsDisplay State Code Definitions Sequence of Operation Check OUT Procedure and Adjustment Set Thermostat To Desired Room Temperature Review All InstructionsVR8205 Maintenance and Cleaning Annual Examination And Cleaning Of Boiler Components Igniter wires Gas valve wiresRemove draft inducer and gasket from top of flue connector Troubleshooting Initial Service ChecksError Codes Differential AIR Pressure Switch Check Boiler Differential PressureAluminum Series Clean System First Fill Water and ChemistryEliminate System Leaks General Guidelines When Using Antifreeze Antifreeze Products Installation and CHECK-OUT Certificate Boiler Model Serial # Date Installed Measured BTU/HR inputPage Lennox Industries Inc. Dallas, Texas
Related manuals
Manual 32 pages 41.03 Kb

GWB9-050IH-2, GWB9-100IH-2, GWB9-075IH-2, Gas-Fired Hot Water Boiler specifications

Lennox International Inc. is a prominent player in the HVAC industry, renowned for its innovative solutions and high-efficiency products. Among its standout offerings is the GWB8 Gas-Fired Hot Water Boiler, available in various models including GWB8-262E-2, GWB8-245E-2, GWB8-280E-2, and GWB8-299E-2. These units are designed to provide reliable and efficient heating solutions for residential applications.

One of the key features of the GWB8 series is its energy-efficient operation. These boilers are designed to achieve an AFUE (Annual Fuel Utilization Efficiency) rating of up to 84%, allowing homeowners to save on energy costs while reducing their environmental footprint. The product utilizes a cast-iron heat exchanger, which promotes optimal heat retention and distribution, ensuring consistent performance throughout the heating season.

The GWB8 series incorporates advanced technologies to enhance comfort and efficiency. A significant innovation is the use of a power venter system that facilitates venting through the sidewall of the home, providing installation flexibility while maintaining safety standards. Additionally, the boilers are equipped with a Honeywell integrated control for precise temperature management and modulating gas valve technology, which adjusts the gas flow to match the heating demand, further optimizing fuel consumption.

Another defining characteristic of the GWB8 models is their durable construction. Designed to withstand the rigors of heating applications, these models feature a robust, powder-painted steel cabinet that helps prevent rusting and corrosion. The access doors are insulated, contributing to overall efficiency while allowing easy maintenance and serviceability.

The GWB8 series is also designed with homeowner comfort in mind. The quiet operation of these boilers ensures that they blend into the living environment without disruptive noise, making them an ideal choice for residential settings. The models are compatible with various heating systems, including hydronic heating, making them versatile and reliable.

Overall, Lennox's GWB8 Gas-Fired Hot Water Boiler series is an excellent choice for homeowners seeking efficient, durable, and reliable heating solutions. With a combination of advanced technologies, energy-efficient performance, and practical features, these boilers set a high standard for residential heating systems in today's market.