Space$aver ™
Air outlet connection
6 Air outlet connection
Waste steam and vapours are cooled by the
Installation under an extraction hood is recommended.
6.1Installation under an extraction hood
→Observe the regulations for room ventilation systems (see Chapter “Room air”, Page 6).
6.2Connection to an air outlet duct
Requirements Connection with a pipe
●
●
Do not use galvanized pipes.
Connection with a hose
●
●
●
●
Do not use aluminium tubes because tube corrosion might occur.
Hose diameter 30 mm Hose length 1.5 m
The end of the hose must not be connected directly to an
1.Connect the unit to an
2.Take care not to create a “water pocket” (sagging when laid horizontally), and that the
Planning and installation instructions | 33 |
Global Foodservice Solutions