Hoshizaki
F-300BAF
service manual
High Pressure Switch
Specs
Wiring Diagram
Timer Board
Maintenance
Sanitizing Procedure Initial
Cleaning Flush Switch
Refrigerant Recovery
Safety
Sanitizing Solution
High Pressure Switch
Page 25
8. High Pressure Switch
In case of high pressure, pressure switch shuts down unit.
F-300BAF
25
Page 24
Page 26
Image 25
Page 24
Page 26
Contents
Self-Contained Flaker Model 300BAF
Hoshizaki AMERICA, INC
Contents
Upper Bearing Wear Check
300BAF
Specifications Icemaker
II. General Information Construction
Ice Making Unit
Auxiliary Code K-2 and L-0
Control Box Layout
Auxiliary Code M-1 and Later
Auxiliary Code L-1 and M-0
Solid-State Timer Board Control
Timer Board
Ice Production Check
Sequence of Operation
300BAF, F-500BAF Sequence Flow Chart and Component Operation
300BAF
Auxiliary Code K-1 and Earlier
Wiring Diagram
Auxiliary Code K-2 and L-0
Auxiliary Code L-1 and M-0
Auxiliary Code M-1 and Later
Sequence of Electrical Circuit
Ice Purge Cycle
Freeze Cycle
Shutdown
Cleaning Flush Switch
Low Water Safety
Spout Safety Switch
High Pressure Switch
ICE Production
Performance Data
IV. Service Diagnosis Diagnostic Procedure
Page
No Ice Production
Diagnostic Charts
Problem Possible Cause Remedy
Low Ice Production
Other
Service for Refrigerant Lines
Removal and Replacement of Components
Refrigerant Recovery
Evacuation and Recharge R-404A
Brazing
Removal and Replacement of Compressor
Removal and Replacement of Expansion Valve
Removal and Replacement of Drier
Page
Removal and Replacement of Evaporator Assembly Components
Upper Bearing Wear Check
Removal and Replacement of Cutter
Removal and Replacement of Auger
Removal and Replacement of Extruding Head
Removal and Replacement of Evaporator
Page
Removal and Replacement of Gear Motor
6b. Lower Housing
Removal and Replacement of Inlet Water Valve
Removal and Replacement of Fan Motor
Removal and Replacement of Flush Water Valve
Page
Cleaning and Sanitizing Instructions
VI. Cleaning and Maintenance
Cleaning Solution
Cleaning Procedure
Sanitizing Solution
Sanitizing Procedure Final
Sanitizing Procedure Initial
Page
Stainless Steel Exterior
Maintenance
Storage Bin and Scoop
Air Filter
Preparing the Icemaker for Long Storage
Related pages
All Switch page
TIP! Switching Back to Expert Probe for Network Instruments 114ff
Choosing Switching and Failover Behavior for HP Serviceguard
For the Switch 4007R 8-Slot Chassis for 3Com 3CB9EF
Introduction Magnum 6K8 Industrial Field Switch Port Modules for GarrettCom 6K8
Operation switch right side of the op- eration panel for Ricoh 340
Switch# show vpc peer-keepalive for Cisco Systems N5KC5596TFA
Indoor Unit Display Switch Panel for Daewoo DMB-3003LH
Isdn Switch Type ISDN-PRI only for Avocent Cyclades-PR4000
Switching Home Screens for Lenovo 59369843
How to troubleshoot common issues with the J200 Sony Ericsson?
Get solutions here
Top
Page
Image
Contents