Ice-O-Matic ICE250 through ICE2100 SERIES manual Air Flow, Remote Condenser Installation

Page 9

ICE Series

Remote Condenser Guidelines

Remote Condenser Installation

For proper operation of the ICE-O-Matic ice machine, the following installation guidelines must be followed. Failure to do so may result in loss of production capacity, premature part failure, and may void all warranties.

Remote condensers must be installed per local building codes. A two to four inch diameter roof penetration will be needed for refrigerant lines and electrical conduit. The penetration should be within two feet of where the condenser will be located. A roof jack must be installed at the penetration.

Installation Guidelines

Ambient operating temperatures: -20°F (-28.9°C) to 120°F (48.9°C)

Maximum refrigerant line length: 60 ft. (18.29 Meters)

Maximum vertical rise:16 ft. (4.88 Meters)

Minimum condenser height: ICE Series ice machine remote condensers must not be installed more than 6 feet (1.3 meters) below the refrigerant line quick connects at the rear of the ice machine. No part of the refrigerant lines, between the ice machine and the remote condenser, should fall below this point. Condensers must have a vertical airflow.

Air Flow

Page 4

Image 9
Contents ICE Series Cubers How To Use This Manual ICE Series ForwardKeep this manual for future reference ICE Series Table of ContentsFreight Claims Important Inspect Promptly Visible Loss or DamageConcealed Loss or Damage Limitation of Implied Warranty ICE Series WarrantyParts and Labor Filing a ClaimICE 040 0 H a Model and Serial Number FormatInstallation Guidelines ICE Series Air Flow Remote Condenser InstallationICE Machine Model Number Remote Condenser Model Number Formula for figuring maximum equivalent run is as followsElectrical and Plumbing Requirements ICEU150, 220, 225 Electrical and Plumbing Requirements ICEU300 ICE Series Electrical and Plumbing Requirements ICE0806 and ICE1006 Electrical and Plumbing Requirements 48 Inch Wide Cubers Electrical and Plumbing Requirements 22 Inch Wide Cubers Electrical and Plumbing Requirements ICE1606 Remote Electrical and Plumbing Requirements ICE1506 Remote How the ICE Machine Works Bridge Thickness and Timer Adjustment Start-Up ProcedureAdjustments are not covered under warranty Bin Control AdjustmentBin Control Operation Undercounter ModelsGeneral Maintenance Procedure Ice Machine Cleaning and Sanitizing Instructions Cleaning stainless steel Cleaning Activity Cleaning AgentMethod of Application Winterizing Procedures Model NumberSerial NumberDate Installed ICE Series Service History