Vulcan-Hart ML-136056 Operation, Lighting and Shutdown Instructions, Compartment Controls

Page 11

C24GA SERIES GAS CONVECTION STEAMERS

OPERATION

The steamer and its parts

are hot. Use care when operating, clean- ing or servicing the steamer.

The cooking compartment

contains live steam. Stay clear when opening each door.

LIGHTING AND SHUTDOWN

INSTRUCTIONS

Lighting

1.Turn manual gas shutoff valve to on position.

2.Press power switch on. Steam will generate in 20 minutes.

3.Ready light will light when compartment is ready for cooking.

4.Load food and set timer to proper cook time. Door must be closed.

Shutdown

1.Press power switch off.

2.Wait 5 minutes before relighting the appliance (if required).

3.Turn manual gas shutoff valve to off position.

4.Do not unplug or turn off power supply for at least 20 minutes after power switch is turned off.

5.Leave compartment door sightly open.

COMPARTMENT CONTROLS

The upper section of the steamer consists of two cooking compartments. Each compartment functions independently with its own controls (See Figure 4) and is a separate, sealed steam chamber during the cooking operation.

The steamer and its parts

are hot. Use care when operating, clean- ing or servicing the steamer.

Compartment Controls and Indicators

 

ITEM

 

FUNCTION

 

 

 

 

 

Ready Light

Indicates the steamer is ready

(Green)

for the cooking cycle

Cooking Light

Indicates the steamer is in the

(Red)

cooking phase

Timer

Set the desired cooking time.

 

 

 

Timer range is 0-60 minutes or

 

 

 

constant. Turn to the OFF

 

 

 

position to silence buzzer.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 4. Cabinet Controls

— 11 —

Image 11
Contents Installation C24GA Series GAS Convection Steamers For Your Safety Important for Your SafetyGeneral InstallationInstallation Codes Standards IntroductionLeveling and Anchoring Location GAS SteamersFilter System Plumbing ConnectionsWater Treatment Water Supply ConnectionDrain Connection GAS Supply ConnectionAir˚Pressure˚ Adjust˚Screw On˚Side˚of˚ Drip˚Cover End Fittings 1 Quick Disconnect End Fittings Both Threaded LengthFlue GAS Exhaust Testing the Gas Supply SystemStart UP Electrical ConnectionElectrical Data Function OperationLighting and Shutdown Instructions Compartment ControlsOperating Startup ProcedurePreheating SteamingDoor Gaskets CleaningDraining Generator CompartmentsGuidelines for Maintaining Stainless Steel Surfaces Leave Compartment Doors OpenFlue MaintenanceScale Related Maintenance Products to be Cooked in Solid Pans Cooking ChartProduct Timer Setting Weight Minutes Products to be Cooked in Perforated Pans Cooking Hints Symptoms Possible Causes Remedy TroubleshootingService and Parts Information Rev B