Vulcan-Hart VHX24G5, MHB24G manual Cabinet Base Boiler Controls

Page 14

VHX SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS

Cabinet Base Boiler Controls Continued

F24700 (October 2001)

 

Page 14 of 68

 

Image 14
Contents VHX Boiler Base Series High Efficiency GAS Steamers VHX24G ShownTable of Contents VHX Series Steamers General InstallationMaintenance Cleaning Introduction Boiler Control Styles Water Supply Water Conditioning SpecificationsSystem ElectricalStandard ToolsGas Supply SpecialCooking Compartment Controls Steamer OperationCabinet Base Boiler VHX Series Steamers OperationBoiler Blowdown Steamer Shut OFF Blowdown/Drain Component FunctionVHX Series Steamers Component Function Ignition Control ModuleWater Inlet Valve manual Steam Header AssemblyWater Level Pressure Relief ValveManifold Pressure Gauge Compartment Pressure SwitchSteam Solenoid Valve Steam Supply ManifoldComponent Locations Removal and Replacement of PartsVHX Series Steamers Removal and Replacement of Parts Cabinet Base Boiler ControlsCabinet Base Boiler Controls Cooking Compartment Controls Water Level Controls Main or Auxiliary LlcoRelay Board Boiler Assembly Water Level Gauge AssemblyPressure Switches Pilot GAS Valve Main GAS Valve Boiler Fill and Cold Water Condenser Solenoid ValvesBurner Head Assembly Complete Burner AssemblyHeat Exchanger VHX Series Steamers Removal and Replacement of Parts Gasket Cooking Compartment DoorsRemoval Latch Assembly HandleBoiler Service Procedures and AdjustmentsClean-Out InspectionWater Level Probe Housing Blowdown Descaler Cathodic ProtectorWater Level Controls TestAuxiliary Low level Cut-Off Control High Limit CyclingFill and Cold Water Solenoid Valves Small incrementsInline Water Strainer Cleaning Boiler BLOWDOWN/DRAIN Solenoid ValvePressure Switch Adjustment Main Burner Ignition ChecksGAS Manifold Pressure Adjustment VHX Series Steamer Service Procedures and Adjustments AIR Pressure Switch Adjustment GAS Pilot Pressure Adjustment Pressure Readings Inches W.C GAS Manifold Pressure Adjustment Ignition Control Module Checks TerminalsSpark Verification Test Cooking Compartment Intake Shut-Off Valve Adjustment Steam FlowDoor Sealing Adjustment Cooking Compartment DoorsDoor Latch Adjustment VHX Series Steamer Electrical OperationElectrical Operation Low Level Cut-Off & Differential ControlAuxiliary Low Level Cut-Off Board Layout and LED Legend LED LegendInitial Conditions State a Boiler Operational Status LED IndicatorReset Engaged State C Aux Water Level Satisfied State BK51 Close Air Pressure Switch Satisfied State DK32 Close Burner ON, Boiler Heating to generate steam State EInitial Fill and Preheat Sequence of OperationNEW Style Controls Boiler HL-LEDN9, N10, N11, N12, N13 go out N14, N16, N17 go outWater Refill After Initial Fill Boiler Blowdown/drainVHX Series Steamer Electrical Operation Cooking Compartment Controls This page Intentionally Left Blank Schematics Models Built After 5/25/00 New Style Boiler ControlsVHX Series Steamer Electrical Operation Models Built Before 5/25/00 Old Style Boiler Controls Cooking Compartment Controls Wiring Diagrams VHX Series Steamer Electrical Operation Models Built Before 5/25/00 Old Style Boiler Controls VHX Series Steamer Electrical Operation Cooking Compartment Controls Boiler Base Controls TroubleshootingVHX Series Steamer Troubleshooting Symptom Possible Causes Adjustments Boiler blowdown solenoid valve clogged and not fully closing Boiler Base Procedures and Adjustments VHX Series Steamer NEW Style Controls only VHX24G, VHX24G5, MHB24G Condensed Spare Parts ListVHX Series Steamer Condensed Spare Parts List