Vulcan-Hart VHX24G5, MHB24G manual Boiler Base

Page 65

VHX SERIES STEAMER - TROUBLESHOOTING

SYMPTOM

 

 

POSSIBLE CAUSES

 

 

 

Steam output low or slow cooking.

1.

Cooking Compartment.

 

 

A. Blocked steam injector ports. (Open door, press door

 

 

 

switch button and verify good steam flow into

 

 

 

compartment).

 

 

B. Steam solenoid valve not fully opening or blocked.

 

 

C. Steam intake shut-off valve closed or out of adjustment.

 

 

 

See "INTAKE SHUT-OFF VALVE ADJUSTMENT (STEAM

 

 

 

FLOW)" in "SERVICE PROCEDURES AND

 

 

 

ADJUSTMENTS".

 

2.

Boiler Base.

 

 

A. Cycling pressure switch malfunction or needs adjustment.

 

 

B. Steam header line (supply) blockage.

 

 

C. Heavy amount of condensate in the pressure controls

 

 

 

steam supply line.

 

 

D. Pressure relief valve leaking.

 

 

E. Steam supply lines leaking badly.

 

 

 

Steamer leaks water.

1.

Loose water, steam or drain line connections (top or base).

 

2.

Heat exchanger gasket not sealing.

 

3.

Leak at gauge glass.

 

 

 

Boiler water level too high.

1.

Fill solenoid does not shut off.

 

2.

Lime scale build-up (moist) on High level probe (open circuit).

 

3.

Water level control malfunction.

 

 

 

Boiler does not fill.

1.

Water supply not on.

 

2.

Fill solenoid not opening or plugged.

 

3.

Water level control malfunction.

 

 

 

Burner won’t light.

1.

Gas not on.

 

2.

Power/reset switch assembly malfunction.

 

3.

Boiler not filling - check fill solenoid for power, clogging or

 

 

malfunction.

 

4.

Air pressure switch:

 

 

A. Not mounted in true vertical position.

 

 

B.

Incorrect pressure setting.

 

 

C.

Malfunctioning switch.

 

5.

Ignition module not receiving power.

 

6.

Steamer not properly grounded and/or polarity of incoming

 

 

power is incorrect on spark ignition systems.

 

7.

Ignition module malfunction.

 

8.

Gas valve malfunction.

 

9.

Water too "pure" for probes to properly conduct electricity.

 

10.

Cycling pressure switch open or set too high. Steamer is

 

 

cycling on high limit.

 

11.

High limit pressure switch open and not re-setting

 

 

(malfunction).

 

12.

Water level control malfunction.

 

13.

Aux. water level control malfunction.

 

 

 

 

Page 65 of 68

 

F24700 (October 2001)

 

Image 65
Contents VHX24G Shown VHX Boiler Base Series High Efficiency GAS SteamersTable of Contents VHX Series Steamers General InstallationMaintenance Cleaning Introduction Boiler Control Styles System Water Conditioning SpecificationsWater Supply ElectricalGas Supply ToolsStandard SpecialCabinet Base Boiler Steamer OperationCooking Compartment Controls VHX Series Steamers OperationBoiler Blowdown Steamer Shut OFF VHX Series Steamers Component Function Component FunctionBlowdown/Drain Ignition Control ModuleWater Level Steam Header AssemblyWater Inlet Valve manual Pressure Relief ValveSteam Solenoid Valve Compartment Pressure SwitchManifold Pressure Gauge Steam Supply ManifoldVHX Series Steamers Removal and Replacement of Parts Removal and Replacement of PartsComponent Locations Cabinet Base Boiler ControlsCabinet Base Boiler Controls Cooking Compartment Controls Water Level Controls Main or Auxiliary LlcoRelay Board Boiler Assembly Water Level Gauge AssemblyPressure Switches Boiler Fill and Cold Water Condenser Solenoid Valves Pilot GAS Valve Main GAS ValveComplete Burner Assembly Burner Head AssemblyHeat Exchanger VHX Series Steamers Removal and Replacement of Parts Gasket Cooking Compartment DoorsRemoval Handle Latch AssemblyClean-Out Service Procedures and AdjustmentsBoiler InspectionDescaler Cathodic Protector Water Level Probe Housing BlowdownTest Water Level ControlsAuxiliary Low level Cut-Off Control Cycling High LimitSmall increments Fill and Cold Water Solenoid ValvesBoiler BLOWDOWN/DRAIN Solenoid Valve Inline Water Strainer CleaningMain Burner Ignition Checks Pressure Switch AdjustmentGAS Manifold Pressure Adjustment VHX Series Steamer Service Procedures and Adjustments AIR Pressure Switch Adjustment GAS Pilot Pressure Adjustment Pressure Readings Inches W.C GAS Manifold Pressure Adjustment Terminals Ignition Control Module ChecksSpark Verification Test Door Sealing Adjustment Intake Shut-Off Valve Adjustment Steam FlowCooking Compartment Cooking Compartment DoorsVHX Series Steamer Electrical Operation Door Latch AdjustmentLow Level Cut-Off & Differential Control Electrical OperationAuxiliary Low Level Cut-Off LED Legend Board Layout and LED LegendReset Engaged State C Boiler Operational Status LED IndicatorInitial Conditions State a Aux Water Level Satisfied State BK32 Close Air Pressure Switch Satisfied State DK51 Close Burner ON, Boiler Heating to generate steam State ENEW Style Controls Boiler Sequence of OperationInitial Fill and Preheat HL-LEDN14, N16, N17 go out N9, N10, N11, N12, N13 go outBoiler Blowdown/drain Water Refill After Initial FillVHX Series Steamer Electrical Operation Cooking Compartment Controls This page Intentionally Left Blank Models Built After 5/25/00 New Style Boiler Controls SchematicsVHX Series Steamer Electrical Operation Models Built Before 5/25/00 Old Style Boiler Controls Cooking Compartment Controls Wiring Diagrams VHX Series Steamer Electrical Operation Models Built Before 5/25/00 Old Style Boiler Controls VHX Series Steamer Electrical Operation Cooking Compartment Controls Boiler Base Controls TroubleshootingVHX Series Steamer Troubleshooting Symptom Possible Causes Adjustments Boiler blowdown solenoid valve clogged and not fully closing Boiler Base Procedures and Adjustments VHX Series Steamer NEW Style Controls only VHX24G, VHX24G5, MHB24G Condensed Spare Parts ListVHX Series Steamer Condensed Spare Parts List