VHX SERIES STEAMER - SERVICE PROCEDURES AND ADJUSTMENTS
COOKING COMPARTMENT
NOTE: For access to compartment controls, remove the right side compartment panel.
Intake Shut-Off Valve Adjustment (Steam Flow)
1.With the right side compartment panel removed, open the intake
2.If the steamer ready light is on, then proceed to step 4.
3.If the boiler is off, then turn main power switch ON and allow boiler to heat up until steamer ready light comes on. Allow boiler to cycle 2 to 3 times, then proceed to step 4.
Door Sealing Adjustment
1.Check the door gasket quality. If damaged or worn, replace as outlined in "REMOVAL" under
"COOKING COMPARTMENT DOOR(S)".
2.Loosen screws until the screw heads no longer touch the gasket plate.
3.Tighten screws until screw head touches gasket plate and at that point begin counting turns.
4.Tighten all screws approximately two turns.
5.Close the door and check for proper operation.
A.If necessary, tighten all screws an additional 1/2 turn and repeat step 5.
6.Repeat step 5 until the door closes properly and no steam leaks are seen around the gasket seal.
4.Turn both cooking timers on.
5.Monitor the boiler until heat source turns off.
6.At that time, adjust the intake
7.Monitor gauge reading 1 to 2 cycles to ensure pressure is set correctly.
8.Once the valve is set, turn both cooking timers off and reinstall right side compartment panel.
Page 39 of 68 |
| F24700 (October 2001) |
|