Vulcan-Hart MHB24G, VHX24G manual Cooking Compartment, Intake Shut-Off Valve Adjustment Steam Flow

Page 39

VHX SERIES STEAMER - SERVICE PROCEDURES AND ADJUSTMENTS

COOKING COMPARTMENT

NOTE: For access to compartment controls, remove the right side compartment panel.

Intake Shut-Off Valve Adjustment (Steam Flow)

1.With the right side compartment panel removed, open the intake shut-off valve completely.

2.If the steamer ready light is on, then proceed to step 4.

3.If the boiler is off, then turn main power switch ON and allow boiler to heat up until steamer ready light comes on. Allow boiler to cycle 2 to 3 times, then proceed to step 4.

Door Sealing Adjustment

1.Check the door gasket quality. If damaged or worn, replace as outlined in "REMOVAL" under

"COOKING COMPARTMENT DOOR(S)".

2.Loosen screws until the screw heads no longer touch the gasket plate.

3.Tighten screws until screw head touches gasket plate and at that point begin counting turns.

4.Tighten all screws approximately two turns.

5.Close the door and check for proper operation.

A.If necessary, tighten all screws an additional 1/2 turn and repeat step 5.

6.Repeat step 5 until the door closes properly and no steam leaks are seen around the gasket seal.

4.Turn both cooking timers on.

5.Monitor the boiler until heat source turns off.

6.At that time, adjust the intake shut-off valve until the manifold pressure gauge reads 9 ±1 psi. The valve setting should be made while the boiler pressure is at the upper cycling limit.

7.Monitor gauge reading 1 to 2 cycles to ensure pressure is set correctly.

8.Once the valve is set, turn both cooking timers off and reinstall right side compartment panel.

Page 39 of 68

 

F24700 (October 2001)

 

Image 39
Contents VHX24G Shown VHX Boiler Base Series High Efficiency GAS SteamersTable of Contents VHX Series Steamers Installation Maintenance Cleaning IntroductionGeneral Boiler Control Styles Electrical Water Conditioning SpecificationsSystem Water SupplySpecial ToolsGas Supply StandardVHX Series Steamers Operation Steamer OperationCabinet Base Boiler Cooking Compartment ControlsBoiler Blowdown Steamer Shut OFF Ignition Control Module Component FunctionVHX Series Steamers Component Function Blowdown/DrainPressure Relief Valve Steam Header AssemblyWater Level Water Inlet Valve manualSteam Supply Manifold Compartment Pressure SwitchSteam Solenoid Valve Manifold Pressure GaugeCabinet Base Boiler Controls Removal and Replacement of PartsVHX Series Steamers Removal and Replacement of Parts Component LocationsCabinet Base Boiler Controls Water Level Controls Main or Auxiliary Llco Relay BoardCooking Compartment Controls Water Level Gauge Assembly Pressure SwitchesBoiler Assembly Boiler Fill and Cold Water Condenser Solenoid Valves Pilot GAS Valve Main GAS ValveComplete Burner Assembly Burner Head AssemblyHeat Exchanger VHX Series Steamers Removal and Replacement of Parts Cooking Compartment Doors RemovalGasket Handle Latch AssemblyInspection Service Procedures and AdjustmentsClean-Out BoilerDescaler Cathodic Protector Water Level Probe Housing BlowdownTest Water Level ControlsAuxiliary Low level Cut-Off Control Cycling High LimitSmall increments Fill and Cold Water Solenoid ValvesBoiler BLOWDOWN/DRAIN Solenoid Valve Inline Water Strainer CleaningMain Burner Ignition Checks Pressure Switch AdjustmentGAS Manifold Pressure Adjustment VHX Series Steamer Service Procedures and Adjustments AIR Pressure Switch Adjustment GAS Pilot Pressure Adjustment Pressure Readings Inches W.C GAS Manifold Pressure Adjustment Terminals Ignition Control Module ChecksSpark Verification Test Cooking Compartment Doors Intake Shut-Off Valve Adjustment Steam FlowDoor Sealing Adjustment Cooking CompartmentVHX Series Steamer Electrical Operation Door Latch AdjustmentLow Level Cut-Off & Differential Control Electrical OperationAuxiliary Low Level Cut-Off LED Legend Board Layout and LED LegendAux Water Level Satisfied State B Boiler Operational Status LED IndicatorReset Engaged State C Initial Conditions State aBurner ON, Boiler Heating to generate steam State E Air Pressure Switch Satisfied State DK32 Close K51 CloseHL-LED Sequence of OperationNEW Style Controls Boiler Initial Fill and PreheatN14, N16, N17 go out N9, N10, N11, N12, N13 go outBoiler Blowdown/drain Water Refill After Initial FillVHX Series Steamer Electrical Operation Cooking Compartment Controls This page Intentionally Left Blank Models Built After 5/25/00 New Style Boiler Controls SchematicsVHX Series Steamer Electrical Operation Models Built Before 5/25/00 Old Style Boiler Controls Cooking Compartment Controls Wiring Diagrams VHX Series Steamer Electrical Operation Models Built Before 5/25/00 Old Style Boiler Controls VHX Series Steamer Electrical Operation Cooking Compartment Controls Troubleshooting VHX Series Steamer TroubleshootingBoiler Base Controls Symptom Possible Causes Adjustments Boiler blowdown solenoid valve clogged and not fully closing Boiler Base Procedures and Adjustments VHX Series Steamer Condensed Spare Parts List VHX Series Steamer Condensed Spare Parts ListNEW Style Controls only VHX24G, VHX24G5, MHB24G